Loading...
First Baptist-CS031114 (2)11/13/2003 19:18 CITY OF COPPELL ENBR. DEPT. 99724628431 November 13, 2003 Brian Odom Starling Richardson Construction 1201 Kas Drive, Suite D Richardson, TX 75081 VIA Fax (972) 462 -8431 RE: First Baptist Church Expansion Scheduling/Traffic Control r 11 6• C 1 T♦ 0 COPPELL ,4 r e NsseJ?7 Apev\oe: -8- b h wee L-te Dear Mr. Odom: Per our discussions today you will begin working from 10:00 p.m. to 6:00 a.m., with two northbound lanes of Denton Tap Road closed in the following proposed phases, weather permitting: Monday. November 17 Sawcut pavement Tuesday. November 18 Demolition and Excavation Wednesday. November 19 Form sanitary sewer manhole (contact the Public Works Department at 972- 462 -5155 for sanitary sewer flow information. Provide Larry Davis with your plans for redirecting the flow during construction of the manhole). Thursday, November 20 Pour sanitary sewer manhole Monday, November 24 Remove forms, raise manhole, and backfill (with flowable fill Tuesday. Novemberj5 .Sawcut and pour pavement slab using TxDOT Type K concrete mix (contact Al Aramoon from TxDOT at 214- 320 -6191 for details and provide Larry Davis with a copy of the mix design). V In addition to the above, the following items were discussed: 1. You have agreed to hire off -duty police officers to direct and divert First Baptist Church traffic as needed. Please contact the church and obtain a schedule of services and special or holiday related events. 2. Because one of the narrow northern driveways will be demolished and rebuilt, you have agreed to place signs, facing internal to the property, indicating that the remaining narrow driveway is for entering vehicles only (see attached exhibit). This NO.894 001 l €-i-.» c 5 c L, eDu it,. a� f 07,5y0,