Bank One-CS031113T N E C 1 T Y O F
November 13, 2003
Sheila Fagg, Project Mgr.
Aguirre Building Systems, Inc.
Fax 972-789-9963
RE: Bank One, Natches Trace Addition
Final Walk-thru
Deaz Ms. Fagg:
Please be advised that awalk-through is scheduled for Friday, November 14, 2003 at 9:30 a. m. for
the water, sanitary sewer, paving and drainage facilities in the referenced project.
Please ensure that all facilities are clean and accessible at that time and that contractor's
representatives aze present to assist with the inspection.
Your cooperation in this effort is greatly appreciated. If you have any questions, please call 972-
304-7090 at your earliest convenience.
Sincerely,
Rick O'Dell
Construction Inspector
Office Phone: (972) 304-7090
Fax: (972) 304-3570
cc: Ken Griffin, Director of Engineering & Public Works
Glenn Hollowell, Asst. Director of Public Works
Greg Jones, Chief Building Official
Lee Stone, Commercial Building Inspector
Travis Crump, Fire Marshal
Roland Asebedo, Deputy Fire Mazshal