Loading...
Bank One-CS031113T N E C 1 T Y O F November 13, 2003 Sheila Fagg, Project Mgr. Aguirre Building Systems, Inc. Fax 972-789-9963 RE: Bank One, Natches Trace Addition Final Walk-thru Deaz Ms. Fagg: Please be advised that awalk-through is scheduled for Friday, November 14, 2003 at 9:30 a. m. for the water, sanitary sewer, paving and drainage facilities in the referenced project. Please ensure that all facilities are clean and accessible at that time and that contractor's representatives aze present to assist with the inspection. Your cooperation in this effort is greatly appreciated. If you have any questions, please call 972- 304-7090 at your earliest convenience. Sincerely, Rick O'Dell Construction Inspector Office Phone: (972) 304-7090 Fax: (972) 304-3570 cc: Ken Griffin, Director of Engineering & Public Works Glenn Hollowell, Asst. Director of Public Works Greg Jones, Chief Building Official Lee Stone, Commercial Building Inspector Travis Crump, Fire Marshal Roland Asebedo, Deputy Fire Mazshal