Loading...
ST9301-CS030811JACOBS Jacobs Civil Inc. 6688 North Central Expressway, Suite 400 Dallas, Texas 75206 U.S.A. 1.214.696.3433 Fax 1.214.696.3499 August 11, 2003 Mr. Ken Griffin, P.E. City Engineer City of Coppell 255 Parkway Blvd. Coppell, Texas 75019 Re: Sandy Lake Road Dear Ken: Attached please find a revised scope and fee estimate for the referenced project. Based on our meeting of August 3, 2003, Jacobs has reduced scope by eliminating several tasks and consolidating efforts to minimize duplication. The bottom line is that our proposed fee has decreased from $220,500 to $93,636. We are proposing an hourly fee with reimbursement of costs. In addition to consolidating our efforts, major scope reductions have been made in the following work areas: 1. Jacobs will rely solely on markups provided by the City of Coppell and its Contractors to prepare the record drawings and will place disclaimers on each plan sheet reflect this limitation. 2. To revise the paving width from 28' to 27' Jacobs will add a note to the plans identifying the change, revise the storm drain inlet detail to reflect an additional foot of recession, and revise the typical cross - sections. 3. The revision to the five parcel documents has been eliminated from the scope. Also attached is a draft contract for your consideration. Please call if you have any questions or comments. I am available for your City Council Meeting in late August. We can begin our work immediately upon their approval. Very Truly Yours, Jacobs Civil Inc. Q D ��,clw�,l 7CJ �tyH ^f/7✓� William G. Pembroke, P.E. Senior Project Manger A Subsidiary of Jacobs Engineering Group Inc.