ST9301-CS030109r SEI Consulting Engineers Scarborough Engineering, Inc. 3129 Handley Dr. Fort Worth, TX 76112 January 9, 2003 Mr. Ken Griffin, P.E. Director of Engineering/Public Works P.O. Box 478 Coppell, TX 75019 7 Subject: Sandy Lake Road Improvements 13 8k Electric Transmission Line Conflict Oncor Line: Liggett- Collin, Dwg TD30507, Sh 13 Dear Mr. Griffin, 817 -451 -6687 817 -451 -0476 Fax We have completed our research and review of the electric line crossing in the vicinity of Sandy Lake Road, Sta. 48 + 49. The west bottom phase conductor calculates to be 21.5 feet above the proposed north curb. The line should be raised 1.5 feet, or the street lowered 1.5 feet. The minimum required clearance is 22 feet. I recommend a target design clearance of 23 feet to allow for construction tolerances and the dynamics of the conductor. Our reduced survey data and calculation spreadsheet is attached. Yours truly, ��S . �toxuoK� Jon D. Scarborough, P.E. Enclosures cw: Bryan Williams, P.E. Don Snow JDS/ld r� ONCOR TRANSMISSION LIGGETT - COLLIN 138kV SANDY LAKE ROAD STRUCTURE 1215 WA 02T61034 ESTIMATE 1/14/2003 Subtotals Totals Steel Tower Section w /Stubs $2,829 Remainder of Material $1,500 Sales Tax $357 Purchasing & Stores $205 Total Material Costs $4,891 Engineering $6,000 TU Labor $615 Non - Productive Time Clearing $0 Payroll Overhead $0 Transportation $0 Contract Labor $45,000 Tower Concrete $0 Pole Concrete $0 Reber Installation $0 Tower Erection $0 Damages $2,000 Environmental Study $0 Surveying $2,000 Clearing $0 Mobilization $0 Inspection Services $1,000 Concrete Testing $0 Labor Sales Tax $0 Labor Contingency $0 Total Labor Costs $56,615 Construction Overhead $6,151 Removal Cost $0 Salvage $0 Total Chargable to WA $67,657 �• -'. ��_ s� s