Loading...
ST9401-CS 960223T MEMORANDUM TO: Ken Gdffin Mike Martin FROM: Ulys Lane DATE: February 23, 1996 SUBJECT: Denton Tap Road; Coppell, Texas W&A NO.: 94093 Ron Mordson and I met with you yesterday to review the results of the Hydraulic studies performed to confirm compliance with FEMA regulations. We also provided a study based on more conservative assumptions for downstream conditions which resulted in higher flood elevations downstream of Denton Tap Road. The proposed bddge provided no dse in the upstsream 100 year FEMA and fully developed conditions with the proposed bddge section. We reviewed the results of the studies and we understand decisions were made as follows: 1. The bddge section as submitted which widens and increases section area at the bddge location was desirable. 2. The low cord at the bddge was agreed to be set at elevation 463. 3. The elevations of the low points in the roadway north of the bddge was set at elevation 462.3. 4. The drainage system discharging at the bddge will be routed to the downstream end of the bridge, The tailwater to be used will be the ten year storm event since the steam 100 year storm is not coincidental to the drainage system 100 year storm. 5. In the future when the sites west of the roadway and north of the creek are constructed, the city will require a positive overflow route through the development to relieve the low points in the roadway in the event there is clogging of the system. Please review the above and let us know if we misunderstood any decisions. End of memo