Loading...
ST9304-CS000605cep Engineering, LTD. EngmetriW ♦ P/annmS Y June 5, 2000 Mr. Mike Martin, P.E. Engineering Department City Hall 255 Parkway Boulevard Coppell, Texas 75019 RE: Traffic Signal Design Plans sett Line and Mockingbird 1, p Kj -- 5 3 `b Dear Mike: PlI find enclosed for your review a preliminary set of design plans for the proposed sigaajs at the intersection of Belt Line and Mockingbird. These plans reflect the same specific design elements that were previously discussed for the Moore intersection. No right turn signal head for the westbound right turn only lane. Two sets of loops on Mockingbird. Median pullboxes are located to account for future widening of Belt Line. Ali mast arms are 44' in length. Set back loops are located at 370' and 500' from the stop bars. Please confirm with your field staff the best location for the controller - we show this one in the northwest comer. We wiB revise the Belt Line and Moore signal design to show the controller in the northwest comer as you requested. We will also add a near side signal head for southbound Moore traffic because the distance to the signals on the south side of Belt Line Road exceeds 150 feet. please review these plans and call me with any questions or comments. I will be happy to stop by your office and review them at your convenience. Respectfully submitted, C&P ENGINEERING, LTD. Dannie R. Cummings, P.E. C.C. Ira Avant, Halff Associates John Mears, P.E., Dallas County Public Works k ��` U k ,� Ir `I" 3501 FM 2181 • Suite 230 • Corinth, Tex" 76205 (940)270 -0602 • Fax (940)270 -8201 7 ( 111 12O M