Loading...
First Baptist-CS031124November 24, 2003 Brian Odom Starling Richardson Construction 1201 Kas Drive, Suite D Richardson, TX 75081 RE: First Baptist Church Expansion Dear Mr. Odom: T H E •C 1 T Y 0 F COPPELL A 8 In accordance with your requests, the City of Coppell Engineering Department provided inspection service at the referenced location on Thursday, Friday, and Saturday, November 20 22, 2003. The overtime rate including salary and benefits is $30.00 per hour. Fourteen hours were charged to your company for those dates. Please send a copy of this letter along with your check for $420.00, payable to the City of Coppell to the following address: City of Coppell Finance Department Attn: Jennifer Armstrong, Finance Director P.O. Box 9478 Coppell, TX 75019 If you should have any questions, please contact me at (972) 304 -3679. Since ;ly, ry ra s Construction Inspector Office Phone: (972) 304 -3684 Fax: (972) 304 -3570 cc: Finance Department Rhonda Brothers, Engineering Secretary 0 255 PARKWAY P. O.BOX 9476 COPPELL TX 75019 TEL 972/462 0022 FAX 972/304 3673 To: EICANI M OW\ Fax: c112 4 (oZ 843I Phone: Re: Or REQUES I of 1112-2 CC: d i rgent ❑For Review Please Comment -Comments: T H E C 1 T Y O F COPPELL From: Date: ENGINEERING DEPARTMENT FAX COVER SHEET Rity DhJIS It\24 j 03 Pages: 1 (including cover sheet) 1 SE -FAQ( (b t 211\10- W/ CoNCRE E MIX SLLeMITr4IL) THE REQUEST PoR- SQThre_oAy 1)12.2. VECI Inner wort K IF YOU DO NOT RECEIVE ALL OF THE PAGES PLEASE CALL (972) 304 -3679 "City of Coppell Engineering Excellence By Design" Please Reply As Requested enta-A4,-. P.O. Box 478 255 Parkway Blvd Coppell, TX 75019 Phone: (972)304 -3679 Fax: (972)304 -3570 Date 11 Name Address City /State /Zip RE: Dear Sincerely, Larry Davis Construction Inspector T H E C 1 T Y 0 F COPPELL City of Coppell Finance Dept. Attn: Jennifer Armstrong PO Box 9478 Coppell, TX 75019 OVERTIME WORKSHEET (PROJECT NAME) In accordance with your request, inspection service was provided by the City of Coppell Engineering Dept. at the referenced location on Saturday, 2003 Sunday, ,2003 The overtime rate including salary and benefits is $30.00 per hour, with a minimum charge of four hours. hours were charged to your company on that date. Please send a check for payable to the City of Coppell to the following address: If you have any questions, please contact me at 972/304 -3679. Nov 21 03 05:18p SRC FBC COPPELL 11/20 17 :06 3175512878 FIRE LINE Starling Richardson Construction Co. 1201 Kas Suite D Richardson, Texas 75081 972- 238 -8131 9724628431 To City of Coppell c/o Lamy Davis Construction Inspector Project: First Baptist Church of Coppell 590 S. Denton Tap Rd. Fire Line Services,a subcontractor for Starling Richardson Construction Coompany, will be performing work in Denton Tap road for the above project on ,2 3 2003 between the hours of 10:OOPM and 6:00AM. This letter authoirizes overtime expense (4 hour minimum) to provide City of Coppell Inspector for these work operations. Expenses incurred should be sent to Starling Richardson for payment. Starling- Richardson Construction Ihasp 1 PI M 1; I PAGE 01 P. 97 2465847,1. Nov 21 03 05:18p SRC FBC COPPELL i 1 /20/2E10 17: BE: 317551 2879 Starling- Richardson Construction Co. 1201 Kas Suite D Richardson, Texas 75081 972 238 -8131 To: City of Coppell do Larry Davis Construction Inspector Project: First Baptist Church of Coppell 590 S. Denton Tap Rd. Fire Line Services,a subcontractor for Starling- Richardson Construction Coompany, will be performing work m Denton Tap road for the above project on r 2003 between the hours of I0:OOPM and 6:OOAM. This letter authoirizes overtime expense (4 hour minimum) to provide City of Coppell Inspector for these work operations. Expenses incurred should be sent to Starling Richardson for payment. Starling -Ric ardson Construction Fra pH -6- PM, 9724828431 p. PIPE LINE PAGE 01