First Baptist-CS031124November 24, 2003
Brian Odom
Starling Richardson Construction
1201 Kas Drive, Suite D
Richardson, TX 75081
RE: First Baptist Church Expansion
Dear Mr. Odom:
T H E •C 1 T Y 0 F
COPPELL
A 8
In accordance with your requests, the City of Coppell Engineering Department provided inspection
service at the referenced location on Thursday, Friday, and Saturday, November 20 22, 2003.
The overtime rate including salary and benefits is $30.00 per hour. Fourteen hours were charged
to your company for those dates.
Please send a copy of this letter along with your check for $420.00, payable to the City of Coppell
to the following address:
City of Coppell Finance Department
Attn: Jennifer Armstrong, Finance Director
P.O. Box 9478
Coppell, TX 75019
If you should have any questions, please contact me at (972) 304 -3679.
Since ;ly,
ry ra s
Construction Inspector
Office Phone: (972) 304 -3684
Fax: (972) 304 -3570
cc: Finance Department
Rhonda Brothers, Engineering Secretary
0
255 PARKWAY P. O.BOX 9476 COPPELL TX 75019 TEL 972/462 0022 FAX 972/304 3673
To: EICANI M OW\
Fax: c112 4 (oZ 843I
Phone:
Re: Or REQUES I of 1112-2 CC:
d i rgent ❑For Review Please Comment
-Comments:
T H E C 1 T Y O F
COPPELL
From:
Date:
ENGINEERING DEPARTMENT
FAX COVER SHEET
Rity DhJIS
It\24 j 03
Pages: 1 (including cover sheet)
1 SE -FAQ( (b t 211\10- W/ CoNCRE E MIX
SLLeMITr4IL) THE REQUEST PoR- SQThre_oAy 1)12.2.
VECI Inner wort K
IF YOU DO NOT RECEIVE ALL OF THE PAGES PLEASE CALL (972) 304 -3679
"City of Coppell Engineering Excellence By Design"
Please Reply As Requested
enta-A4,-.
P.O. Box 478
255 Parkway Blvd
Coppell, TX 75019
Phone: (972)304 -3679
Fax: (972)304 -3570
Date 11
Name
Address
City /State /Zip
RE:
Dear
Sincerely,
Larry Davis
Construction Inspector
T H E C 1 T Y 0 F
COPPELL
City of Coppell Finance Dept.
Attn: Jennifer Armstrong
PO Box 9478
Coppell, TX 75019
OVERTIME WORKSHEET
(PROJECT NAME)
In accordance with your request, inspection service was provided by the City of Coppell
Engineering Dept. at the referenced location on
Saturday, 2003
Sunday, ,2003
The overtime rate including salary and benefits is $30.00 per hour, with a minimum charge of
four hours. hours were charged to your company on that date. Please send a check
for payable to the City of Coppell to the following address:
If you have any questions, please contact me at 972/304 -3679.
Nov 21 03 05:18p SRC FBC COPPELL
11/20 17 :06
3175512878 FIRE LINE
Starling Richardson Construction Co.
1201 Kas Suite D
Richardson, Texas 75081
972- 238 -8131
9724628431
To City of Coppell c/o Lamy Davis Construction Inspector
Project: First Baptist Church of Coppell 590 S. Denton Tap Rd.
Fire Line Services,a subcontractor for Starling Richardson Construction
Coompany, will be performing work in Denton Tap road for the above
project on ,2 3 2003 between the hours of 10:OOPM and 6:00AM.
This letter authoirizes overtime expense (4 hour minimum) to provide City of
Coppell Inspector for these work operations.
Expenses incurred should be sent to Starling Richardson for payment.
Starling- Richardson Construction
Ihasp 1 PI M
1; I
PAGE 01
P.
97 2465847,1.
Nov 21 03 05:18p SRC FBC COPPELL
i 1
/20/2E10 17: BE: 317551 2879
Starling- Richardson Construction Co.
1201 Kas Suite D
Richardson, Texas 75081
972 238 -8131
To: City of Coppell do Larry Davis Construction Inspector
Project: First Baptist Church of Coppell 590 S. Denton Tap Rd.
Fire Line Services,a subcontractor for Starling- Richardson Construction
Coompany, will be performing work m Denton Tap road for the above
project on r 2003 between the hours of I0:OOPM and 6:OOAM.
This letter authoirizes overtime expense (4 hour minimum) to provide City of
Coppell Inspector for these work operations.
Expenses incurred should be sent to Starling Richardson for payment.
Starling -Ric ardson Construction
Fra pH -6- PM,
9724828431 p.
PIPE LINE PAGE 01