Loading...
Vista Ridge 1st P-CS 880712UNIVEST DEVELOPMENT COMPANY July 12, 1988 Mr. Alan Ratliff Coppell City Manager 225 Parkway Boulevard P.O. Box 478 Coppell, Texas 75019 Re: Denton Creek channel in%grove~nts Dear Mr. Ratliff: I z~n in receipt of your letter of June 30th with the acccm~panying corre- spondence. I wanted to write this letter to em~ize a point which was not discussed in the correspondence from [~mas and Nettleton and its representat ives. It is my .~ory that Izmnas and Nettleton agreed before the Texas Water C~,,,ission to construct and leave in place a check dam at the confluence of the old Denton Creek Channel and the flood relief channel. The purpose of this check dam was to maintain normal water flows in Denton Creek. The purpose of the study to be conducted one year after the ccl~pletion, was to see if the check dam was, in fact, working as planned, mile it is im- portant that the study is to be prepared; it is n~ach more fundamentally important that the check dam has apparently been L~,~ed, after being in place for over two years during the construction period. Any study conducted at this time w~uld not reflect the real impact of the syst~mm approved by the Texas Water Co,,,ission because that system has been altered just prior to the study being c~,,,enced. It see~s to me that the city _r~cds to Get an answer from the Denton County Levee Imp~cye~ment District No. 1, as to when the check dam is going to be replaced and the study should take plaee after it is replaced. Yours very truly, P2g~KS ~ COPPELL JOINT VEN~I~g Michael R. Allen, President MRA/lz Wayne Ginn Larry Jackson John Kidd Glen Hinckley