Loading...
Dynasty Cleaners-CS031202T H E C I T Y O F COl'FELL December 2, 2003 Jared M. Jackson, Jr. J.P. Brothers, Inc. 2464 Manana Rd Dallas. TX 75220 Dynasty Cleaners Addition, Lot 1 Block 1 Final Acceptance Dear Mr. Jackson: The improvements in the above referenced project were inspected during construction by the City of Coppell Engineering Department and were installed according to plans and our specifications governing such work. As of the date of this letter, the facilities are accepted subject to the two-year maintenance agreement. Thm~k you tbr your cooperation during this construction, and if I can be of further service, please contact me at (972) 304-3685. Sincerely, Construction Inspector Office Phone: (972) 304-3685 Fax: (972) 304~3570 CC: Ken Griffin, Director of Engineering & Public Works Rhonda Brofl~ers, Engineering Secretary Glenn Hollowel}, Director of Public Works Greg Jones, Chief Building Official Travis Crump, Fire Marshal Insurors Ii ff6mnltv t ompany P.O. Box 2683 · 3701 W. Waco Drive · Waco, Tx 76702-2683 www. insurors, com· 800-933-7444. Fax 240-414-5500 MAINTENANCE BOND Bond No. 606687 KNOW ALL MEN BY THESE PRESENTS: That, Fritz Plumbing & Air. Inc. of the City of Frisco, State of Texas, as Principal and INSURORS INDEMNITY COMPANY, a corporation organized under the laws of the State of Texas, as Surety, are held and firmly bound unto the City of Coppell. Texas, as Obligee in the sum of Eight Thousand Fifty Seven and no/100 ($8,057.00), lawful money of the United States of America, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents: WHEREAS, on the 27th day of March, 2002 the Principal entered into a contract to construct Coppell 5'h Avenue Cleaners, for the sum of $51.394.00: and WHEREAS, under the terms of the specifications for said work, the said Principal is required to give a bond for $8.057.00 to protect the Obligee against the result of faulty materials or workmanship for a period of 2_ year(s) from and after the date of the completion and acceptance of same. NOW, THEREFORE, if the said Principal shall for a period of one year from and after the date of the completion and acceptance of same by said Obligee replace any and all defects arising in said work whether resulting from defective materials or defective workmanship, the above obligation shall be void; otherwise to remain in full force and effect. Signed this 22nd day of May, 2003. Fritz Plumbing & Air. Inc. Principal ln,~urors PC ~WER O1: ATTORNEY PA NO 606687 An ORIGINAL bond r~qmreo by Statute, Decree of Coup! or Ordi~a~ce ~or. John A Gordon of the City of The Colony, State otTexa$ Mammum Authority kimil r:co ..... anull $25 000 $10 000 $20.000 $50 000 No Authont. S25.000 No Authority ,810.000 S10 000 $ 3 300 No Authont~ 550 000 ~dayd This Power of Attorney Expires 12/31/2004 ~ r ......... Ticpc~[,¢ ,,.Sccreuav FRITZ UTILITIES P.O. BOX 194 FRISCO, TX 75034 PHONE: 972-33~3560 FAX 972-335-8998 DATE: RE: 5/21/03 J.P. BROTHERS, INC. DYNASTY CLEANERS, COPPELL PUBLIC IMPROVEMENTS WATER 8" Water Main Installed Fire Hydrant 12"x8' Tap 2" Domestic Tap and Box 1" Irrigation Tap and Box SANITARY SEWER 5' manhole Installed STORM DRAIN 6' Curb Inlet 18" RCP Connect to Existing Inlet 120 LF ~ $ 30.00 1 EA ~ $ 2,500.00 I EA ~ $2,200.00 1 EA ~ $ 780.00 I EA ~ $ 650.00 1 EA ~ $1,800.00 1 EA ~ $2,600.00 44 LF ~ $ 36.00 1 EA ~ $ 400.00 TOTAL $ 3,600 $ 2,50O $ 2,200 $ 780 $ 650 $1,800 $ 2,600 $1,584 $ 400 $16,114 MAINTENANCE BOND AMOUNT 1/2 OF TOTAL $ 8057