SS9901-CS031203COl'FELL
December 3, 2003
Mr. Mark Denton
Director of State and Federal Review
Archeological Division
Texas Historical Commission
P.O. Box 12276
Austin, Texas 78711
DeForest Road Lift Station Improvements
Force Main Line D / SS 99-01
Dear Mr. Denton:
The City of Coppell is designing construction plans for Force Main Line D. The project
will consist of the installation of approximately 8700 L.F. of 30-inch force main. The
installation of the pipe will be bid with two alternate construction methods: open cut and
directional drilling. Depending on the type of construction bid, the excavation may
exceed 5000 cubic yards. We are requesting your review and approval of the plans as
required by the Texas Antiquities Code. Enclosed please find a set of half-scale plans for
the proposed construction.
The project is located in the Carrollton Quadrangle. The majority of the force main will
be constructed in the median of MacArthur Boulevard, and a small portion will be
constructed in private and City owned property. It is anticipated that construction will
start in early 2004
Should you have any questions or need any additional information, please contact me at
972-304-7019. Your consideration of this matter is appreciated.
Sincerely,
aylor
nator
Enclosures