Loading...
Freeport NIP(7.0)-LR031125Client: Project: Services: neers 8908 Ambassador Row, Dallas~ TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Duke Realty Services, LP Attn: Mr. Jeff Langston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Report No.: 197643 Project No.: 037333 Date of Service: 10/27/2003 Report Date: 11/25/2003 Freeport 10 500 Freeport Parkway Coppell, TX Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONTRACTOR: Duke Realty Services, LP CONCRETE SUPPLIER: Hanson PLANT: 27 SPECIleICAT1ON REQUIREMENTS 3500 psi @ 28 Days 5" maximum 4% - 6% ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA MIX DESIGN I.D.: 7752 PLACEMENT DATE: 10/27/2003 WEATHER CONDITIONS: Clear TIME SAMPLED: 5:20am BATCHTIME: 4:41am TEMPERATURE (F) - AIR 49 F CONCRETE: 78 F TRUCK NO: 1015 TICKET NO: 76485 AIR CONTENT (%): 5.1 UNITV~E1GHT(pcO: NA OVERALL PLACEMENT LOCATION: Paving 350' west, 350' north from southwest comer of building SAMPLE LOCATION: REPORT OF TEgT$ 120' north, 40' east from southwest comer of paving Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 4.25 11/03/2003 7 113465 ~/ Unbonded Cap 1 2 4.25 11/24/2003 28 141085 ~~0 Unbonded Cap 1 3 4.25 11/24/2003 28 136695 Unbonded Cap Average ( ~,,~1910 1 4 Hold Water added at ~ lgallons LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 01DD Page 1 of 4 Ri: neers 8908 Ambassador Row, Datlas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: Project: Services: Duke Realty Services, LP Attn: Mr. Jeff Langston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Report No.: 197643 Project No.: 037333 Date of Service: 10/27/2003 Report Date: 11/25/2003 Freeport 10 500 Freeport Parkway Coppell, TX Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONXlt~CXOm Duke Realty Services, LP CONCRETE SUPPLIER: Hanson PLANT: 27 SPECIFICATION REQUIREMENTS 3500 psi @ 28 Days 5" maximum 4% - 6% ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA MIX DESIGN I.D.: 7752 PLACEMENT DATE: 10/27/2003 WEATHER CONDITIONS: Clear TIME SAMPLED: 7:10am BATCH Tram: 6:41am TEMPERATURE (F) - AIR 5 1 F CONCRETE: 8 1 F TRUCK NO: 1883 TICKET NO: 76498 AIRCONTENT(%): 5.4 UNIT WEIGHT (pcf): NA OVERALL PLACEMENT LOCATION: Paving 350' west, 350' north from southwest comer of building SAMPLE LOCATION: REPORT OF TE~qTg 115' north, 50' west from southeast comer of paving Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLLNDER MEASURED 1ViA XIMUIVI COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 1 4.75 11/03/2003 7 108840 3850 Unbonded Cap 2 2 4.75 11/24/2003 28 135970 4810 Unbonded Cap 2 3 4.75 11/24/2003 28 134275 4750 Unbonded Cap Average 4780 2 4 Hold Water added at site: 5 gallons LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clienks to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 01DD Page 2 of 4 ineers 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: Duke Realty Services, LP Attn: Mr. Jeff Langston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Report No.: 197643 Project No.: 037333 Date of Service: 10/27/2003 Report Date: 11/25/2003 Project: Services: Freeport 10 500 Freeport Parkway Coppell, TX Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONTRACTOR: Duke Realty Services, LP CONCRETE SUPPLIER: Hanson PLANT: 27 SPECIFICATION REQUIREMENTS 3500 psi @ 28 Days 5" maximum 4% - 6% ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECTDATA MIX DESIGN I.D.: 7752 PLACEMENT DATE: 10/27/2003 WEATHER CONDITIONS: Clear TEVIESAMPLED: 8:05am BATCHTIME: 7:35am TEMPERATURE (F) - AIR 6 1 F CONCRETE: 8 ! F TRUCK NO: 30 TICKET NO: 76505 AIR CONTENT (%): 5.4 UNIT WEIGHT (pcf~: NA OVERALL PLACEMENT LOCATION: Paving 350' west, 350' north from southwest comer of building SAMPLE LOCATION: REPORT OF T gTg 40' west, 10' south from northeast comer of paving Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER MEASURED MAX1MIYM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 3 1 4.5 11/03/2003 7 97125 3430 Unbonded Cap 3 2 4.5 11/24/2003 28 128540 4550 Unbonded Cap 3 3 4.5 11/24/2003 28 123435 4370 Unbonded Cap Average 4460 3 4 Hold LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subiect matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and'shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 01DD Page 3 of 4 ineers 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: Project: Services: Duke Realty Services, LP Attn: Mr. Jeff Langston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Report No.: 197643 Project No.: 037333 Date of Service: 10/27/2003 Report Date: 11/25/2003 Freeport 10 500 Freeport Parkway Coppell, TX Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONTRACTOR: Duke Realty Services, LP CONCRETE SUPPLIER: Hanson PLANT: 27 SPECIFICATION REQUIREMENTS 3500 psi @ 28 Days 5" maximum 4% - 6% ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA MIX DESIGN I.D.: 7752 PLACEMENT DATE: 10/27/2003 WEATHER CONDITIONS: Clear TIME SAMPLED: 10:25am BATCH TIME: 9:35am TEMPERATURE (F)-AIR 73 F CONCRETE: 86 F TRUCK NO: 1850 TICKET NO: 76522 AIR CONTENT (%): 5.8 UNIT WEIGhT (pet): NA OVERALL PLACEMENT LOCATION: Paving 350' west, 350' north from southwest comer of building SAMPLE LOCATION: REPORT OF TE T, 80' west, 40' north fi.om southeast comer of paving Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER MEASURED MARKED SLUMP SET NO. (inches) MAXIMUM COMPRESSIVE DATE AGE LOAD STRENGTH FRACTURE TESTED (days) (lbs. force) (psi) TYPE 4 1 5.0 4 2 5.0 4 3 5.0 4 4 Water added at site: Technician: Jeremy Watts Report Distribution: (1) Duke Realty Services, LP (1) City of Coppell Engineering Dept. ( 1 ) Potter Concrete (1) Pacheco Koch Consulting Engineers 11/03/2003 7 96210 11/24/2003 28 118330 11/24/2002 .~'~'~!8 112830 Average Hold 10 gallons ~ Starte~ Finished: 12:30pm (1) Engineering Analyst ( l ) City of Coppell Bldg. Inspections ffUnbonded Cap Unbonded Cap Unbonded Cap L.j090 K. Scott Watson, AET CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 01DD Page 4 of 4