Loading...
Freeport NIP(7.0)-CS031209D~c 09 O~ )O:lSa P- ! MEMORANDUM FROM THE DEPARTMENT OF PUBLIC WORKS To; From: Date: RE: 2. 3. 4. Larry Davis, Construction Inspector Engineering Larry Morton, Streets Division Public Works December 9, 2003 WaLk-thru Container Store -'~OLLO ~ ~/~ (Oi~GIAI~ L /9~NCH l.I ~ Item #! on previous walk thru not done yet. Clean & seal all joints (remove zip strip in approaches). Item #4 back fill sidewalk. Item #5 remove zip strip and seal sidewalk. A: ~-T~c~')) CJTY OF COPPELL PUBLIC IYORKS D£PARTMENT