Loading...
ST9304-CS 960913The City With A Beautiful Future P.O. Box 478 Coppell, Texas 75019 214-462-0022 September 13, 1996 Ms. Jill M. Brim, P.E., Project Engineer Dallas County Department of Public Works 41! Elm Street, 4th Floor Dallas, TX 75202 RE: Belt Line Road Project ST 93-04 Dear Ms. Brim: At the September 10, 1996 City Council meeting, there was discussion concerning the construction of Belt Line Road and Sandy Lake Road. After discussion, it was determined that the City Council would have no problem with Belt Line Road being constructed before Sandy Lake Road. I am unsure if there is right-of-way to be acquired for the construction of Belt Line Road, but if so, the City would appreciate having the documents provided as soon as possible so that we can begin the process of acquiring any necessary right-of-way. Again, Council is in support of moving ahead with the construction of Belt Line Road construction. If you should have any questions please feel free to contact this office at your convenience. Sincerely, Kenneth M. Griffin, P.E. Assistant City Manager/City Engineer