Loading...
ST9401-CS 950804Morrison Hydrology/Engineering, Inc. 210 Arnold * Arlington, Texas 76010 · Metro (817) 461-0321 August 4, 1995 Mr. Ulys Lane, P.E. Weir and Associates, Inc. 4300 Beltway Place Suite 130 Arlington, Texas 76018 Rex Denton Tap Road, coppell, Texas W & A No. 94093 Dear Mr. Lanes This is an update on our progress with the subject bridge analysis and a completion schedule. As you are aware, the major time delay for this study has been because we have not been able to obtain a copy of the Effective Flood Insurance Study (FIe) model. The models provided by the City were not correct, and we were unable to obtain the effective models from Dowdy Anderson. We finally received the effective FIS model from FEMA last month in hard copy format. We had to code this model into our computers and obtain a duplication. This is now complete. Kimley Horn and Associates developed an Ultimate condition model for the City. We intend to use this model to obtain ultimate condition flows. These ultimate flows will be input into the FEMA FIS model, and this will be our design condition. The following Is our schedule for completion of the bridge studyl Schedule ~otion Add survey data to the FEMA FIS model to obtain an existing condition model. Complettg~ Date Aug. 9, 1995 O~AH NOSI~OW ~:~0 gI, II dBS ~! I 1[ Page -2- 2. Review the ultimate Aug. 9, 1995 condition HEC1 model completed by Kimley Horn and input results in the existing condition HEC2 model to obtain an uZtimate condition HEC2 model. 3. Input the proposed bridge Aug. 11, 1995 changes into the existing condition model to determine a proposed condition. 4. Modify the proposed condition Aug. 17, 1995 as necessary to obtain a model that causes no increase in flood levels at FEHA and ultimate conditions. 5. Develop existing and Aug 22, 1995 proposed condition Zloodways. 6. Print models Aug. 23, 1995 Plot water surface profiles Plot cross sections and cross section modifications Delineate existing floodplain and floodway Delineate proposed floodplain and floodway 7. Prepare a report that describes Aug. 29, 1995 methodology and results and provides necessary documentation This means that you will have information to design the bridge by no later than Aug. 17, 1995. Please let me know if this poses a problem. In the meantime we will try to improve this schedule if possible. Sincerely, Morrison Hydrology/~ngineering, Inc. Ronald W. Horrison, P.E. Senior Hydrologist