Loading...
WA9901-CS031210 T H E - C ! T Y · 0 F COPPEL£ December 10, 2003 Melissa Uselding Project Manager Site Concrete, Inc. 3340 Roy Orr Blvd. Grand Prairie TX 75050 fax 972-313-3146 Meadowcreek/Rolling Hills Waterline Project WA 99-01 Final Walk-thru Dear Ms. Uselding: Please be advised that a walk-through has been scheduled for Thursday, December 11, 2003 at 10:00 a.m. for the waterline facilities in the referenced project. Please ensure that all facilities are clean and accessible at that time and that contractor's representatives are present to assist with the inspection. Your cooperation in this effort is greatly appreciated. If you should have any questions, please call 972-304-3685 at your earliest convenience. Sincerely, Garreth D. Campbell, Sr. Construction Inspector Office Phone: (972) 304-3685 Fax: (972) 304-3570 CC: Ken Griffin, Director of Engineering & Public Works Rhonda Brothers, Engineering Secretary ~/Glenn Hollowell, Asst. Director of Public Works