Loading...
Freeport NIP(2.8)-CS030311March 11, 2003 COPFELL Mr. Bob Lutn-ell Jackson & Cooksey 12750 Merit Drive Suite 1310, LB 51 Dallas, TX 75251 Re: Dexas International, Ltd. Dear Mr. Luttrell: 1 am writing to provide you with additional information regarding the previously discussed site issues at the property on the northwest comer of Creekview Drive and Royal Lane. Listed below are the areas in which the City may further alleviate some of the development costs. Lime Stabilization The City may waive this requirement if the pavement is constructed 1 inch thicker than the standard or PSI 4000. The Building Official will take the recommendation of your structural engineer whether lime stabilization will be required under the building foundation. If further information is requested, please contact Teresa Turner (972-304-3681), Graduate Engineer or Greg Jones (972-304-3500), Building Official. 2''a Entrance on Creekview Drive Neither the Planning nor the Engineering Departments will require a second entrance along Creekview Drive. For Fire Code purposes, an internal drive may be required to be constructed along the front of the building, but full construction ora second access it not anticipated to be needed to meet this requirement. If further information is requested, please contact Travis Crump (972) 304- 3503, Fire Marshal. Roadway Impact Fees Previously, a 75% Roadway Impact Fee Credit was offered to Dexas, reducing this fee to $11,925.00. To further alleviate Dexas' up front fees, the City would like to offer a full 100% Roadway Impact Fee Credit ($0.00 due), resulting in a savings of $47,700. Additionally, you had mentioned that construction cost of a hooded left: turn on Royal Lane was estimated at $50-$55,000 and I wanted to indicate to you that the City Engineering Depar~nent estimated this cost at a maXtmum of $15,000-$20,000. I hope the expanded incentives will assist Dexas with some of the unanticipated costs related to development of the subject site. If you have any questions or comments regarding any of the information contained herein, please feel free to contact me at your convenience. Sincerely, Andrea L. Roy Economic Development Coordinator