Loading...
SS9901-CS031211T H E . C I T Y . 0 F CO??ELL December 3, 2003 Mr. Mark Denton Director of State and Federal Review Archeological Division Texas Historical Commission RO. Box 12276 Austin, Texas 78711 IJ£C 0, 8 2083 RE: DeForest Road Lift Station Improvements Force Main Line D / SS 99-01 Dear Mr. Denton: The City of Coppell is designing construction plans for Force Main Line D. The project will consist of the installation of approximately 8700 L.F. of 30-inch force main. The installation of the pipe will be bid with two alternate construction methods: open cut and directional drilling. Depending on the type of construction bid, the excavation may exceed 5000 cubic yards. We are requesting your review and approval of the plans as required by the Texas Antiquities Code. Enclosed please find a set of half-scale plans for the proposed construction. The project is located in the Carrollton Quadrangle. The majority of the force main will be constructed in the median of MacArthur Boulevard, and a small portion will be constructed in private and City owned property. It is anticipated that construction will start in early 2004. Should you have any questions or need any additional information, please contact me at 972-304-7019. Your consideration of this matter is appreciated. Sincerely, aylor nator Enclosures 255 PARKWAY * P 0 BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673