ST9301-CS031217Page 1 of 1
Suzan Taylor - Re: SANDY LAKE ROAD - Water Tap
From: Suzan Taylor
To: Debbie KJger
Date: 12/17/2003 8:28 AM
Subject: Re: SANDY LAKE ROAD - Water Tap
Debbie:
The inspector checked on the meter at the "ag barn". It is a 2-inch meter that will need to be raised. So we
need a 2" tap, 2" line, and adjust the meter.
>>> "Kiger, Debbie" <Debbie. Kiger@jacobs.com> 12/16/2003 9:09:32 AM >>>
Suzan
One of our tasks is to include a water line tap from the existing 12" on the
South side of SLR to a new meter on the north side of SLR for the "ag
building" at the very east end of the project.
Does your staff know the required line and meter sizes?
Please advise so that I can include the correct sized items in the
quantities.
Thank you
Debbie
NOT]CE - This communication may contain confidential and privileged
information that is for the sole use of the intended recipient. Any viewing,
copying or distribution of, or reliance on this message by unintended
recipients is strictly prohibited. If you have received this message in
error, please notify us immediately by replying to the message and deleting
it from your computer.
file://C :~Documents%20and%20Scttings~staylor~Local%20Scttings\Temp\GW } 00001 .HT.. · 12/17/2003