Loading...
ST9301-CS031217Page 1 of 1 Suzan Taylor - Re: SANDY LAKE ROAD - Water Tap From: Suzan Taylor To: Debbie KJger Date: 12/17/2003 8:28 AM Subject: Re: SANDY LAKE ROAD - Water Tap Debbie: The inspector checked on the meter at the "ag barn". It is a 2-inch meter that will need to be raised. So we need a 2" tap, 2" line, and adjust the meter. >>> "Kiger, Debbie" <Debbie. Kiger@jacobs.com> 12/16/2003 9:09:32 AM >>> Suzan One of our tasks is to include a water line tap from the existing 12" on the South side of SLR to a new meter on the north side of SLR for the "ag building" at the very east end of the project. Does your staff know the required line and meter sizes? Please advise so that I can include the correct sized items in the quantities. Thank you Debbie NOT]CE - This communication may contain confidential and privileged information that is for the sole use of the intended recipient. Any viewing, copying or distribution of, or reliance on this message by unintended recipients is strictly prohibited. If you have received this message in error, please notify us immediately by replying to the message and deleting it from your computer. file://C :~Documents%20and%20Scttings~staylor~Local%20Scttings\Temp\GW } 00001 .HT.. · 12/17/2003