ST9602-CS031020DALLAS COUNTY
PUBLIC WORKS
October 20, 2003
Ms. Suja Mathew, P.E.
Texas Department of Transportation
4777 East ttighway 80
Mesquite, Texas 75150
Subject: Congestion Mitigation Air Quality (CMAQ) Program
Mylar revisions, MacArthur at Belt Line - Project 10
Dear Ms. Mathew:
Attached please find the revised mylar sheets for the above project and intersection. USA Engineering
completed these plan revisions due to your Pre-Austin review comments. Plan sheet 19 was revised to
reflect existing sidewalks on both sides of MacArthur Blvd. In addition, the signal sheet 26 was revised
to reflect the type A groond box quantities and the removal of the existing brick pavers.
Please insert these revised sheets into the plan set that were previously sent to your office and destroy the
replaced sheets. If you have any questions or concerns, please call me at this office at 214-653-7460 or
Sam Wilson at 214-653-6421.
Sincerely,
Craig J. Goodroad
Program Manager
Attachment: (1.) Mylar Plan Sheets 19 and 26 - 2 copies
Cc:
Sam Wilson, P.E., Dallas County, Asst. Dir., Transportation and Planning, w/o attachment
Kenneth Griffin, P.E., City of Coppell, w/I copy of attachment
Sam Moghadassi, P.E., TxDOT Roadway Desigm, w/o attachment
Scott Young, P.E., USA, lnc., w/attachment
S:\GeneraI\G04CORR\G4-1OUT~TXDOT~-003\1086 Pl0 Mylar Revisions due to Pre-Austin Review.doc
411 Elm Street, 4th Floor Dallas, Texas 75202 214-653-7151
F~°II 'Nd 65:E0: LO ~0/~ ~/0~. '5~"P'scl'qtuq~og\~)¥H3 o~, ~uas sSu~e~p leU!~\~O96\s'pa[O~cl\:cJ
61_
0'3
Z
C
0
~N~9 1~38
7~E~
~-x