Loading...
ST9902-CS031215 Page 1 of 1 Suzan Taylor - Pavement Marking Detail From: Matt Atkins <matkins@tnp-online.com> To: "Suzan Taylor (E-mail)" <staylor@ci.coppell.tx.us> Date: 12/15/2003 11:08 AM Subject: Pavement Marking Detail CC: "Ken Griffin (E-mail)" <kgriffin@ci.coppell.tx.us>, Jay Volk <jvolk@tnp-online.com>, Mike Jones <mjones@tnp-online.com> Suzan, As I was looking over the revised pavement marking detail that you sent me, ~ noticed some significant changes from the previous details. In particular, the dimensions on the left turn lanes appear to have changed from 10.67' to 10.0' (from back- of-curb to centerline of the buttons). With the revised button configuration, it would leave a left turn lane of just over 9' in width. Additionally, I want to confirm the lane widths for through lanes. The revised detail does not give a distance to the buttons from back-of-curb for two through lanes. It appears that they are shown in the center and not offset .33' as shown in the original detail. I just want to make sure that we are not missing something or misunderstanding the revised detail before we make revisions to our pavement marking plans. I appreciate your time and have a great day. Matt Atkins Teague Nail and Perkins, Inc 12160 North Abrams Road, Ste. 508 Dallas, Texas 75243 Ph. 214-461-9867 Fax: 214 461-9864 The information contained in this message is intended to be legally privileged and confidential for the use of the named recipient. If the reader is not the named recipient, you are hereby notified that any dissemination or copying of this message is strictly prohibited, if you are not the named recipient, please immediately notify the sender and destroy the message and all copies. file://C:\Documents%20and%20Settings\staylor\Local%20Settings\Temp\GW } 00001 .HT... 12/15/2003