Loading...
ST0202-CS031212419 East Highway 80 PAVING COMPANY P.O. Box 270040 Dallas, Texas 75227-0040 Tel (972) 289-0723 Fax (972) 216-5637 Friday, December 12, 2003 City of Coppell 255 Parkway Coppell, TX 75019 Attn: Kenneth M. Griffin, P.E. Re: Bethel School Road Project #ST02-02 Tiseo Paving Co. believes that our schedule submitted at the preconstruction meeting, shows the critical path for this project consists of the street excavation, CTB subgrade and paving. In fact, this is the vast majority of the work on this project. In your letter, you stated that there is a substantial amount of work that can be done while waiting for Oncore Gas to relocate services. 1 do not believe that two driveways for the post office shown on Sheet 8 of the plans is a "substantial" amount of work (approximately 765 SY). In fact. the driveways at Pav. Sta. 4+27 should have been done in conjunction with the road paving, because of the CTB subgrade required. Since the original schedule called for these driveway to be completed along with the major road paving, shuffling the sequence of these driveway does not recapture any lost time. Furthermore, the completion of these driveways in no way effects the amount of days needed to complete the project. The gas services in conflict were found on November 19th, 2003 and a meeting was established on November 20th, 2003 with Oncore Gas. Oncore finally completed lowenng their services December 8th, 2003. We believe that time suspension or extension of the contract time should be given from November 20th, 2003 through December 8th, 2003, because work on the critical path could not be done. The contract time of 75 calender days was tight enough to complete, as long as no conflicts arose. Please find attached a revised schedule showing the Oncore Gas conflict and establishing a new time frame. Should you need any further information, regarding this matter, please feel free to contact me. Sincerely, Robert Caudill Project Admn. m