Loading...
SW0001-CS031003DATE: CLIENT: PROJECT: WEEKLY PROJECT STATUS REPORT September 29 - October 03, 2003 City of Coppelf Riverchase Elementary School PROJECT NO.: BY: REVIEWED BY: 2230-01.148 Bradley J. Moss Steve A. Markussen Date 10/01 cc: Item BJM called Suzan Taylor (Coppell) and asked if Records Drawings were needed to complete the project. She is to check into that, but does not think they are required until the top rail is put on the sidewalk. City of Coppelf - Kenneth Griffin BJM/slt 2230-41