SW0001-CS031003DATE:
CLIENT:
PROJECT:
WEEKLY PROJECT STATUS REPORT
September 29 - October 03, 2003
City of Coppelf
Riverchase Elementary School
PROJECT NO.:
BY:
REVIEWED BY:
2230-01.148
Bradley J. Moss
Steve A. Markussen
Date
10/01
cc:
Item
BJM called Suzan Taylor (Coppell) and asked if Records Drawings were needed to complete
the project. She is to check into that, but does not think they are required until the top rail is
put on the sidewalk.
City of Coppelf - Kenneth Griffin
BJM/slt
2230-41