Loading...
Woodridge-LR 810911SOUTH vVESTERN I /1,BORATOR1LS, INC. TEXAS • LOUISIANA • ARKANSAS TESTING, INSPECTION 6 e i - C , 1 f i. j MATERIALS ENGINEERS Dallas, Texas September 11, 1981 Filr No 2 7126- 06 Report of tests on Soil Density -To L & N Land Corporation Date Recd. 9/9/81 Attn: Mr. Stephen Crim Received from Southwestern Contracting Company Identification Marks Woodridge Additions, Phase III FIELD DENSITY TESTS: Location Flood Plane 1. South 11 +50, West 2 +00 lst lift 2. South 10 +50, West 1 +50 1st lift 3. South 9 +50, West 1 +25 lst lift 4. South 12 +00, West 1 +00 lst lift 5. South 13 +50, West 1 +00 lst lift 6. South 14 +0 , West 1 +50 1st lift 7. South 12 +50, West 1 +50 1st lift 8. South 14 +50, West 0 +50 1st lift 9. South 13 +00, West 0 +25 lst lift 10. South 11 +50, West 0 +50 lst lift 11. South 10 +00, West 1 +00 1st lift Material: Tan & Brown Clay Light Tan & Brown Cand Field Field Optimum Proctor Moisture Density Moisture Density Percent ( %) (Lbs. /Cu. Ft.) ( %) (Lbs. /Cu. Ft.) Density 17.0 101.3 20.0 102.5 98.8 18.7 100.5 20.0 102.5 98.0 23.1 98.5 20.0 102.5 96.1 18.1 101.1 20.0 102.5 98.6 18.9 100.7 20.0 102.5 98.2 14.5 101.6 20.0 102.5 99.1 10.0 117.0 9.7 117.6 99.5 15.8 103.0 20.0 102.5 100.5 16.8 100.0 20.0 102.5 97.6 12.0 98.5 20.0 102.5 96.1 22.1 103.2 20.0 102.5 100.7 102.5 # /cu.ft. @ 20.0% optimum moisture 117.6 # /cu.ft. @ 9.7% optimum moisture Technician: Lewis Jones cc: 2-Mr. Crim 1- Lichliter /Jameson & Associates 501L1 I-A(N LARORAI 'S, INC. 1- Southwestern Contracting Co. 6iJ��C/ 1 -City of Coppell /Mr. Barnett Lab. No. D -6142 J1 / Out Ic 1teR and reports are for the earlu.ivc uce of the client to uhom thry arc addres%ed. The um of our name mutt Irlte recrnc our prior mntten appr A'al Our ✓ n and rr porn apply to t he an Plc tr yrd and o. r•rrrrr rl nd e ere n I nrr�csv rih indvaror of the quahnr•. of an r.n r••th Id,nt,c,l nr nmitn p•nd n; r,