Loading...
Woodridge-LR 810922S, INC. SOUII1 ,-alERN LABORAT(3.A' ])alla,.T,'xa~ September 22, 1981 Fih' No. 27126-06 Report of tests on To Received from Identification Marks FIELD DENSITY TESTS: Lo~ation Soil Density L & N Land Corporation Attn: Mr. Stephen Crim Woodridge Additions, Phase III ASTM D-2922 D-3017 Date Red& 9/18/81 Field Field Optimum Proctor Moisture Density Moiature Der~ity Percent (%) ~Lbs./Cu. Ft.) (%) (Lbs./Cu. Ft.) Density 1. 2+00 South, 1+70 West 1st lift 20.8 101.75 20.0 102.5 99.2 2. 2+00 South, 1+00 t~est 1st lift 19.6 104.5 20.0 102.5 101.9 3. 1+50 West, O0 South 2nd lift 19.1 105.75 20.0 102.5 102.6 Material: Dark tan & brown clay with limestone 102.5#/cu.ft. @ 20.0% optimum moisture NOTE: The above tests comply with minimum requirements of 95% maximum dry density of ASTM D-698. Technician: G. Cotton cc: 2-Mr. Crim / 1-Lichliter/dameson & Associates 1-Southwestern Contracting Company 1-City of Coppell/Mr. Barnett ESTER SOUTII ' ' .,t ]ERN L:[BORATOi{ S, INC. September 22, 1981 27126 06 Dalla~.T~.xa~ Fil~ Report of tests on To Received from Identification Marks Soil density L & N Land Corporation Attn: Mr. Stephen Crim Woodridge Additions - Phase III FIELD DENSITY TESTS: Date Red& - Flood Plain 9/21/81 3rd lift 1. North 1+25, West 1+25 2. Sta. 0+00, West 1+00 3. South 1+25~ West 2+00 4. South 2+25, West 1+00 Field Field Optimum Proctor Moisture Demsity I~foisture Der~ity (%) (Lbs./Cu. lat.) (%) (Lbs./Cu. Ft.) 21.3 99.75 19.3 101.5 19.0 101.25 19.3 101.5 22.3 96.0 24.8 94.6 20.8 96.0 24.8 94.6 Density 98.2 99.7 101.4 101.4 Material: Light tan and yellow clay Dark brown clay lO1.5#/cu, ft. @ 19.3 optimum moisture 94.6#/cu. ft. @ 24.8% optimum moisture Technician: G. Cotton 2 - Mr. Crim 1 - Lichliter/Jamesoh & Associates, Mr. Elsie 1 - Southwestern Contracting Co. 1 - City of Coppell, Mr. Barnett $Ot~TII Lab. No. D6596 my ,/ SOUTIi I STERN r, LABOIt;A 10 O,.S, INC. I)alla~-.T,.xas. September 22, 1981 Filr No. 27126 06 Report of tests on To Received from Identification Marks Soil density L & N Land Corporation Attn: Mr. Stephen Crim Woodridge Additions - Phase III FIELD DENSITY TESTS: Date Rec'd. 9/17/81 - Flood Plane Location Field Field Optimum Proct~r Moisture Density Moisture Dertsity (%) (Lbs./Cu. Ft.) (%) (Lbs./Cra Ft.) 1. North Sta. 0+50, West 1+00 28.9 91.2 24.8 94.6 2. North Sta. 1+00, West 0+75 22.7 89.9 24.8 94.6 3. South Sta. 0+00, West 1+00 24.7 90.7 24.8 94.6 Material: Dark brown clay 94.6#/cu. ft. @ 24.8% optimum moisture Denaity 96.4 95.0 95.9 Technician: L. Jones 2 - Mr. Crim i - Lichliter/Jameson & Associates, Mr. 1 - Southwestern Contracting Co. 1 - City of Coppell, Mr. Barnett Elsie/