Smart Start-LR 990616MAXIM
TECHNOLOGIES INC
REPORT OF
MOISTURE - DENSITY RELATIONS
CLIENT: WEBB CONSTRUCTION
5952 ROYAL LANE #110
ATTN: GARY WEBB
DALLAS, TX 75230
PROJECT: SMART START SCHOOL
NATCHES TRACE & DENTON TAP RD.
COPPELL
PAGE 1 OF 1
Maxim Technologies Inc.
2575 Lone Star Drive
Dallas, Texas 75222
Telephone: (214) 631 -2700
FAX: (214) 920-1891
PROJECT NO.: 9908651
REPORT NO.: 148251
DATE OF SERVICE: 6/09/99
AUTHORIZATION: David
REPORT DATE: 6/16/99
SERVICES: Obtain sample of material used for construction, prepare samples and
perform moisture - density relations test to establish the maximum density
and optimum moisture of the material.
CONTRACTOR: Webb Construction
DATE SAMPLED: 6/09/99
SAMPLED BY: Joe Henry Jernigan
TEST FOR: Building Subgrade
SAMPLE LOCATION: Middle of Building Pad
98
96
94
DRY
DENS.
(pore 92
Pi
PROJECT DATA
TEST DATE: 6/15/99
MATERIAL: Dark Brown Clay
CLASSIFICATION:
MATERIAL PREPARATION METHOD: Moist
RAMMER TYPE: Mechanical
METHOD OF TEST: ASTM D698, Method A
ASTM D4318, Method B
REPORT OF TESTS
MOISTURE CONTENT 1 %)
Technician: Oscar Garza
Report Distribution:
111 WEBS CONSTRUCTION
1 City of C"WI
n 11 l City of CepOdf
MAXIMUM DENSITY, PCF: 94.0
OPTIMUM MOISTURE 1 %1: 24.5
LIQUID LIMIT:
71
PLASTIC LIMIT:
20
PLASTICITY INDEX:
51
E - Estimated Value
Laboratory Manager
Our IOU" "rapprta re for the axclulve W of the Cha s W
n to whom py re addressed rd shad not reoroduud sotmPt in
fOf without the approval of IN teetim laboratory. ne use A ov name mut raoeive ov written ypeval. Ov letter a d wort,
100e 5 apply only to the sample tested "/a inpected. rd w rat 0,Oicatiw of t 9uandtie of "Won,ly idendul w r ilar po,wft.