Loading...
ST9401-CS 940329Section 6: West o~ Ehe Buriington Northern Railroad to East of Legacy (--lane divided highway) (CSJ 0364-03-043) Completed March 29, 1994 Section 7: East of Legacy to East S.H. 289 (4-lane divided)(including the S.H. 289 intersection) (CSJ 0364-04-028 & 0364-04-032) Project is complete and open to traffic. Section 8: S.H. 289 to U.S. 75 (4-lane divided) (CSJ 0364-04-022) On "hold" status in the 1995 PDP. The Dallas District has requested that this project be elevated to Level II authority in the 1996 PDP Update. 2,; ._Ca,t_-e~_o~[!!,_~Al.-. Na~~iOnal HighwaY, S.Y..~.~.em Mobi_litY- (See attached for right of way status) A. Section 9: , North (3- l~e, frontage roa~) 1. 13' :'==Sta e , ~ 1995= TIP= ~s~. ~clude this proJg~ 4, Es~i~ed construction cos~ is 5. "PI~ a~a~e college ~d T~OT has sen~ these plus ~o ~he u~ili~y comp~ies. TxDOT is waiting for the property owner of parcel 27 to provide the location of a drainage easement across his property which will take water from S.H. 121 to Denton Creek. The property owner has agreed Co donate the drainage easement as long as he gets to decide its location on his property. TxDOT and the City of Coppell are currently working on an agreement which would allow TxDOT to construct a permanent drainage structure along Denton Tap Road which would be compatible with Coppell's future Denton Tap Road construction. without the agreement, TxDOT would provide a temporary system to transport drainage runoff from S.H. 121 to Denton Creek along Denton Tap Road which Coppell would replace with a permanent system during their Denton Tap Road construction.