ST9401-CS 940329Section 6:
West o~ Ehe Buriington Northern Railroad
to East of Legacy (--lane divided
highway)
(CSJ 0364-03-043)
Completed March 29, 1994
Section 7:
East of Legacy to East S.H. 289 (4-lane
divided)(including the S.H. 289
intersection)
(CSJ 0364-04-028 & 0364-04-032)
Project is complete and open to traffic.
Section 8:
S.H. 289 to U.S. 75 (4-lane divided)
(CSJ 0364-04-022)
On "hold" status in the 1995 PDP. The Dallas
District has requested that this project be
elevated to Level II authority in the 1996 PDP
Update.
2,; ._Ca,t_-e~_o~[!!,_~Al.-. Na~~iOnal HighwaY, S.Y..~.~.em Mobi_litY-
(See attached for right of way status)
A. Section 9: , North
(3- l~e, frontage roa~)
1. 13' :'==Sta e
, ~ 1995= TIP= ~s~. ~clude this proJg~
4, Es~i~ed construction cos~ is
5. "PI~ a~a~e
college ~d T~OT has sen~ these plus ~o ~he
u~ili~y comp~ies.
TxDOT is waiting for the property owner of parcel
27 to provide the location of a drainage easement
across his property which will take water from S.H.
121 to Denton Creek. The property owner has agreed
Co donate the drainage easement as long as he gets
to decide its location on his property.
TxDOT and the City of Coppell are currently working
on an agreement which would allow TxDOT to
construct a permanent drainage structure along
Denton Tap Road which would be compatible with
Coppell's future Denton Tap Road construction.
without the agreement, TxDOT would provide a
temporary system to transport drainage runoff from
S.H. 121 to Denton Creek along Denton Tap Road
which Coppell would replace with a permanent system
during their Denton Tap Road construction.