Loading...
ST9304-CS 960815DALLAS COUNTY PUBLIC WORKS 0¢ August 15, 1996 Mr. Ken Griffin, P.E. Assistant City Manager/City Engineer City of Coppell 255 Parkway Boulevard Coppell, TX 75019 Belt Line Road -- Project No. 490-403.1 / 91-829 (Denton Tap Road to MacArthur Boulevard) Project Status Dear Mr. Griffin: The project design has been on hold for almost three months while Coppell has been working with adjacent property owners on drainage issues. The County understands that Coppell's discussions with the property owners may have a positive affect on the project drainage. However, Coppell must decide the on project drainage issues so that the design can be completed. Please contact Jill M. Brim, P.E., at 653-7151 about the status of Coppell's discussions and the schedule for resolving the drainage issues. Sincerely, Allen Bud Beene, P.. )2.:/q 411 Elm Street Dallas, Texas 75202 653-7151