Loading...
Riverchase (6.2)-LR 971117CONCRETE COMPRESSIVE STRENGTH TEST ENGINEERING. INC. 4747 Irving Blvd., Suite N206 Dallas, Texas 75247 Date of Service: 11/05/1997 Report No.: 9723928 Report Date 11/17/1997 Client No.: 17192300 Client: Dallas Car Wash, Ltd. Attn: Grey Stogner 6780 Abrams Road, Suite 207 Dallas TX 75231 Project No.: 43-1803-97 Project: Grand Car Wash Riverchase and MacArthur Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples.** PROJECT DATA CONTRACTOR: Spring Valley COD$trI1C110D CONCRETE CLASS: 9339 CONCRETE SUPPLIER: PlOneer CDDOrete PLACEMENT DATE: 11/OS/1997 BATCH TIME: 11:00 PLANT: 22 TIME SAMPLED: 11:30 am sY: Terry L. Smith SPECIFICATION REQUIREMENTS STRENGTH: 3000 p51 ~ 28 Days SLUMP: S" AIR: N/A TEST METHOD: ASTM C-143 ASTM C-172 ASTM C-39 WEATHER CONDITIONS: HOt TEMPERATURE (Fl-AIR 7S F CONCRETE: 82 F TRUCK NO: 7S6 TICKET NO: $7OS74 AIR CONTENT (^i ): N/A UNIT WEIGHT (pct: N/A PLACEMENT LOCATION: Driveway/Carwash SAMPLE LOCATION: IS'N of S, 8'E of W from main entry REPO RT OF TESTS ACCUMULATIVE YARDS: lO CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (Ibs. force) (psi) TYPE 1 1 S.SO 11/12/1997 7 67070 2370 1 2 5.50 11/12/1997 7 70930 2510 Average 2440 1 3 S.SO 12/03/1997 28 1 4 S.SO 12/03/1997 28 Technician: Terry L. Smith Started: 11:00 Finished: 2:00 pm ~ Eng-D g, Report Distribution: (1)Dallas Car Wash, Ltd. (1)CiTy of Coppell (I) Winkelmann & Associates, Inc. Eugene Harbour (1) ROF/DW Architects ~ Vice President (p Spring Valley Construction This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc OtA1P Page 1 of 1