Loading...
Riverchase (6.2)-LR 971104CONCRETE COMPRESSIVE STRENGTH TEST ~~ ENGIIQF,ERINC, INC. 4747 Irving Blvd., Suite #206 Dallas, Texas 75247 Date of Service: 10/03/1997 Report No.: 9721405 Report Date 11/04/1997 Client No.: 17192300 Client: Dallas Car Wash, Ltd. Attn: Grey Stogner 6780 Abrams Road, Suite 207 Dallas TX 75231 Project No.: 43-1803-97 Project: Grand Car Wash Riverchase and MacArthur Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples.** CONTRACTOR: CONCRETE SUPPLIER: PLANT: SPECIFICATION STRENGTH SLUMP: AIR: TEST METHOD: PROJECT DATA Spring Valley Construction colvcRETE CLASS: 9339 Pioneer Concrete PLACEMENT DATE: lO/O3/1997 BATCH TIME: 12:01 pm 22 TIME SAMPLED: 12:40 pm BY: Mlke Sh1e1dS REQUIREMENTS 3000 psi @ 28 Days 5" N/A ASTM C-143 ASTM C-172 ASTM C-39 SAMPLE LOCATION CYLINDER MARKED SET NO. 1 1 1 2 1 3 1 4 South comer of Building A MEASURED SLUMP (inches) 6.00 6.00 6.00 6.00 WEATHER CONDITIONS: Slimly TEMPERATURE (N)-AIR 88 F CONCRETE: 89 F TRUCK NO: 12O AIR CONTENT(%): NIA PLACEMENT LOCATION: Paving, south parking area REPORT OF TESTS TICKET No: 558629 OMIT WEIGHT (pcQ: N/A ACCUMULATIVE YARDS: 7O MAXIMUM COMPRESSIVE DATE AGE LOAD STRENGTH TESTED (days) (Ibs. force) (psi) 10/10/1997 7 10/10/1997 7 10/31/1997 28 10/31/1997 28 81250 74490 Average 97910 100500 Average 2870 2630 275C 3460 3550 3510 FRACTURE TYPE This report is exclusively for [he use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. oIAK Page 1 of 2 CONCRETE COMPRESSIVE STRENGTH TEST ENGINEERWG, INC. 4747 Irving Blvd., Suite #206 Dallas, Texas 75247 Date of Service: 10/03/1997 Report No.: 9721405 Report Date 11/04/1997 Client No.: 17192300 Client: Dallas Car Wash, Ltd. Attn: Grey Stogner 6780 Abrams Road, Suite 207 Dallas TX 75231 Project No.: 43-1803-97 Project: Grand Car Wash Riverchase and MacArthur Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples.** PROJECT DATA coNTRACroR: Spring Valley Construction CONCRETE SUPPLIER: PlOrieer CODCiete PLANT: 22 SPECIFICATION STRENGTH SLUMP: AIR: TEST METHOD: REQUIREMENTS 3000 psi @ 28 Days Sn N/A ASTM C-143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: 200'E of S comer of Building A CONCRETE CLASS: 9339 PLACEMENT DATE: lO/O3/1997 BATCH TIME: 1:$S pm TIME SAMPLED: 3:20 pm BY: Mlke ShleldS WEATHER CONDITIONS: TEMPERATURE (F) -AIR TRUCK NO: 7S6 AIR CONTENT (^i ): N/A PLACEMENT LOCATION: Paving, south parking area REPORT OF TESTS ACCUMULATIVE YARDS: ISO CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (Ibs. force) (psi) TYPE 2 1 5.00 10/06/1997 3 63200 2230 2 2 5.00 10/10/1997 7 77820 2750 2 3 5.00 10/10/1997 7 78360 2770 Average 2760 2 4 5.00 10/31/1997 28 94220 3330 2 S 5.00 10/31/1997 28 99930 3530 Average 3430 Technician time on report 9721460 Technician: Mike Shields Started Report Distribution (1) Dallas Car Wash, Ltd. (1) City of Coppell (1) Winkelmann & Associates, Inc. (l) ROF/DW Architects (I) Spring Valley Construction Finished: I~ Engl in C. Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall no[ be reproduced except in full without the written approval of HBC Engineering, Inc. Sunny 92 F CONCRETE: 89 F TICKET NO: SS86S1 UNIT WEIGHT (pcQ: N/A OIAK Page 2 of 2