Loading...
ST9302-CS011102By: INVESTMENTS; 972 991 7500; Nov-5-01 8:49AM; Page 2/3 COPPELL COMMERCIAL CENTER 12201 ~ DHow, 8ul~e 170 (972) ~9'1-4600 Fax (91'2) 991-7500 November 2, 2001 VIA FACSIiMIIIq AND U.S. MAIL Mr. Ken Griffin Director o£Engineering City of Coppell P.O. Box 478 Coppell, TX 75019 RE: 1080 Sandy Lake Road Irrigation System, Landscaping and Concrete Damage Caused by Sandy Lake Road Construction Dear Ken: Pursuant to your request, I have attached the estimate for the cost to repair and restore the landscaping, retaining wall and irrigation at thc Shopping Center at Sandy Lake and MacArthur. As I also mentioned during our conversation, the East/Kimbcl Court curb cut driveway is damaged and we need to replace a damaged section caused by heavy equipment/track hoe. The 24+ month construction time has been devastating for thc Tenants and their ability to be a viable business Please contact me so we may meet at the site and proceed with the restoration work as soon as possible. Thank you for your assistance and prompt attention. Alen I-llnckley Manager attachxncnt ~ent By: TN'JESTL~ENTS; 972 991 7500; NOV-5-01 8:49AM; Page 3/3 Oct. Wheeler Company landscape · design · i~talladon · maintenance P. O, Box 13826 · ArhnRton, TX 76094-0820 (817) 472-9394 · Fax (817) 472-0088 BID Octob~ 11. 2001 TO: Univ~$t Property 12201 Merit Drive suite 170 Dallas, TX 75251 WHEELER COMPANY he[eby proposes tO f~rnish ell materials, labor and equipment lo fully compl~ ~ as ~ thie P~pos~. We am p~asea ~ su~ the ~g ~.- Job ~p~on: ~ from r~d MA TC'4~AI.~ & O~t~NTITY I~,CRiIrrlON LANDSCAPE UNI? PI~C~ ,, TOTAL InsUlt 1~ ya~'B~ s~ ............. ~B.~ '~28,20 install ~' X 18~ Winder stone wa I "- 1,497.~ 1 ~nstall 270 4' ~I$ Llro~ 405.~ ~5~ nslall ~ lin~ ~. st~ ~gln~ 2.10 IRRIGA~ON .., Repa{r & mpl~ ~sting ir~g~on sys~m (i~lud~ bering) ,, 2 250.~ 2.2~.~ ~1~ ~x 376.19 Pr~e valid un6~: 11/11/01