Loading...
ST9502-CS 960403 (2)To: From: lIE: Date: MEMORANDUM Carolyn Bebermeyer, Accountant Kenneth M. Griffin, P.E., ACM/City Engineer Town Center BIrd. Escrow Cheek April 3, 1996 Please cancel the check that you are holding in the vault for $310,877.95 to Jay S. Turner and void the paperwork associated with that request. .d: Date: MEMORANDUM Jennifer Armstrong, Finance Director Kenneth M. Griff'm, P.E., ACM/City Enginee~ Town Center Bird. / Project//ST 95-02 March 11, 1996 Attached to this memo is a purchase requisition form in the amount of $310,877.95 to Jay S. Turner as pan of our escrow for the construction of the roadway, streets, utilities and drainage associated with Town Center Blvd. You may recall that we discussed this project recently and in going through the actual numbers I indicated to you that the City's construction cost on this project was actually $272,965.30 from the Series 1995 and 1995A C.O. 's and $54,342.50 from water and sewer funds for a total City participation of $327,307.80. The discrepancy between the $327,307.80 and $310,877.95 is the fact that Harry Hargrave is putting $10,000 toward landscaping and 6,429.85 toward the engineering of the project. I have requested that we encumber the entire $327,307.80 and utilize the difference to offset our engineering cost already paid and to landscape the project once completed. Therefore, while we are only requesting a check in the amount of $310,877.95, we are requesting that the entire $327,307.80 be encumbered for future landscaping considerations associated with Town Center Blvd. If you should have any questions please feel free to contact me at your convenience.