Loading...
ST9502-CS 951207TO: FROM: SUBJECT: CITY OF COPPELL, THE PARKS OF COPPELL TRUST, COMERICA TIM WES~ CHANGE ORDER ON EAST-WEST ROAD DATE: DECE~MBER 7, 1995 The approved set of plans call for the fire hydrant, which is located on Denton Tap Road, but within the road bed of the new east-west road, to be removed. The inspector for the City of Coppell (Larry Davis) not only wants the fire hydrant removed from its present location, but also wants to have it re-installed 34' to the north. The re-installation of the fire hydrant, tee, and 6" valve is the reason for this change order. TPW/csp WENDY'S INTERNATIONAL, INC. / 4545 Rn,F~ DR., $UrrE 404, IRVING, TX 75038 / 214-791-0070 12/06/199S 17:49 **** PANAFAX UF-600 **** CHANGE ORDER AIA DOCUMENT G701 PROJECT: (name, address) TO (Contractor): WENDY'S OFF-SITE IMPROVEMENTS (9520-A) 112 North Denton Tap Coppall, TX 75019 LANDMARK GENERAL CONTRACTORS, INC. 7S8 North Carroll Ave, Southlake, 1')( 76092 You are directed to make the following changes in this Contract: Remove the existing fire hydrant at the Denton Tap/Town Center Drive intersection and re-install the existing fire hydrant. tee and 6" valve approximately 34 If north. 14715769 P. 02 DT DISTRIBUTE TO: OWNER ARCHITECT CONTRACTOR FIELD OTHER CHANGE ORDER NUMB I INITIATION DATE; 12-06-95 ARCHITECT'S PROJECT NO: CONTRACT FOR: CONTRACT DATE: Off-site Development 10-16-95 $943.00 TOTAL CO #1 'Valid until signed by both the Owna~' a~c~ '~,~Chltect. ' ........................ Signeturc ofthc C.:onlractor indicMcs his ngrcomcnt herewith, including any ad. iustmcnt in the C:onxrsct Sum or Contract 'l'ime. $943.00 Th'~'c~ri~n~ (Cantracer Sum) Net change by previously authorized Change Orders ........................... ! .............................................................. The (Contract Sum) (Guc;.~ta~l Me.l~ ...... ~) prior to this Change Order was .............................................. The (Contact Sum) (~orant&cd Max:n,~,., ~t) will be (incmased)~de~reosed) by this Change Order .................................................................................................................................... The new (Contract Sum) (Gwr~teed ~xi~ .... ~t) including this Change Order ........................................... The Contract Time will be (incised) (d~reased) by The Date of Substantial Completion as of the date of this Change O~er therefore is (e.a, amee~ '~;~. ;',~', COSt) Was ................ '...-:..'-:::';:'::":'.'.'., :.' ....................................""i~1,25g.db' $0.00 $461,259.00 $943.00 $462,202.00 ( ) Days ARCHITECT ...... 'A~ldress .......... BY DATE A]A ]')OCU}vJP_.,N'I' C]70 ] LANDMARK GENERAL CONTRACTORS.IN WENDY'8 INTERNATIONAL. INC. CONTRAC~!'OR ........... 61~ji~ER .... 758 North Carroll Ave. 4288 West Dublin-Granville Road AddresS' ...............~ Address ........ ;uth~...T.X_ ;' ..  '0. ~ ' ._D.u. biin, pH 43017 Ge ........... ,. . ,.~N~resident of BY LANDMARK ERAL CONT CTS'j~:'INd ............................. DATE: 12-06-95 DATE