Loading...
ST0202-CS031222T H £ · C: I T Y · 0 F COPPELL December 22, 2003 Mr. Robert Caudill, Proj. Admin. Tiseo Paving Company PO Box 270040 Dallas TX 75227-0040 RE: Bethel School Road Reconstruction ST 02-02 Dear Robert: In accordance with your request, the City of Coppell Engineering Department provided inspection service at the referenced location on Saturday, December 20, 2003. The overtime rate including salary and benefits is $40.00 per hour. Nine hours were charged to your company on that date. Please send a copy of this letter along with your check for $360.00, payable to the City of Coppell to the following address: City of Coppell Finance Department Atto: Jennifer Armstrong, Finance Director P.O. Box 9478 Coppell, TX 75019 If you should have any questions, please contact me at (972) 304-3679. Sincerely, Office Phone: (972) 304-3685 Vax: (972) 304-3570 CC: Finance Department Rhonda Brothers, Engineering Secretary T H E C I T Y 0 F CO?P-ELL OVERTIME WORKSHEET In accordance with your request, inspection service was provided by the City of Coppeli Engineering Dept. at the referenced location on Saturday, ~ ~ , ~ Sunday, ,2001 The overtime rate including salary and benefits is $40.00 per hour, with a minimum charge of four hours. ~,~ hours were charged to your company on that date. Please send a check for $ .4~J~~'g~''~ payable to the City of Coppell to the following address: City of Coppell Finance Dept. Attn: Jennifer Armstrong PO Box 9478 Coppell, TX 7_5019 If you have any questions, please contact me at 972/304-3679. Sincerely, Garreth Campbell Construction Inspector TLMESHEET CORRECTION FORM A copy of the original timesheet must be attached to this form Employee No.: ~ 3 ~7 Department No.: Pay Period Correcting; ACTUAL TEME REPORTED ACTUAL TIME SHOULD BE Date Pay Code Hours Pay Code Hours ~ION TUE WED THU SUN EXPLANATION FOR CORRECTION SIGNATURES: EMZPLOYEE: tscf.xls