Vista Point II-CS031125DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: PD-199, Vista Point II~ MacArthur Ridge, zoning change request from HC (Highway Commercial) to PD-199-HC (Planned Development-199-Highway Commercial) with a Concept Plan to allow the development six office buildings, with limited warehousing, totaling approximately 200,000 square feet, and five retail/restaurant pad sites on approximately 26 acres of property located at the southwest corner of SH. 121 and MacArthur Blvd, at the request of Demian Salmon of Jackson-Shaw Company and Jeff Libby of MacArthur R/dge Partners. STAFF REP.: Marcie Diamond PROJECT ID# PD-03-0078 DRC DA TE: November 25, 2003 and December 4, 2003 CONTACT: Teresa M. Turner, E.L T., Graduate Engineer (972)304-3681 COMMENT STATUS: ,,"PRELIMINARY F4NA:g RE~.~£ED 1. Verify driveway spacing and locations along the SH 121 frontage road with TxDOT. 2. Minimize the number of taps made into the water main for the domestic and irrigation water services. It may be possible to make a single tap in some locations and branch out to adjacent buildings. 3. Verify fire hydrant spacing, FDC locations, and fire line requirements with the Fire Dept. 4. Indicate which utilities will be installed with which phases of the development. 5. It appears that the northern driveway onto MacArthur Blvd. is in conflict with an existing curb inlet. The driveway curb return cannot begin at the back of the inlet. 6. Stamped concrete paver bands are required at the driveway approaches. 7. Proposed storm drainage systems will need to be submitted in the future. If the system in MacArthur Blvd. was not designed fur a 100-yr storm, it may be necessary to provide on- site detention. Please verify. 8. A deceleration lane is required on MacArthur and may be required on SH 121. Verify with TxDOT. 9. Eliminate the public on-site fire hydrant from SH 121. Bring the fire hydrant off the private fire line.