Vista Point II-CS031126City of Coppell -DRC Comments, received November 26, 2003 Project # PD-199 I Agency: Building Inspection Electric & Gas Engineering Reviewed By: Greg Jones Jeff Curry Teresa Curry DRC Comment: 1. Site plan does not include any interior floor, plan information to provide basis for rewew, no comments noted 1. Please contact Jeff Curry at 972-570-4126 to discuss electric service requirements 1. Verify driveway spacing and locations along the S.H. 121 frontage road with TxDOT. 2. Minimize the number of taps made into the water main for the domestic and irrigation water services. It may be possible to make a single tap in some locations and branch out to adjacent buildings. 3. Verify fire hydrant spacing, FDC locations, and fire line requirements with the fire department, 4. Indicate which utilities will be installed with which phases of the development. 5. It appears that the northern driveway onto MacArthur is in conflict with an existing curb inlet. The driveway curb return cannot begin at the back of inlet. 6. Stamped concrete paver bands are required at the driveway approaches 7. Proposed storm drainage systems will need to be submitted in the future. If the system in MacArthur BIvd. was not designed for a 100-year storm, it may be necessary to provide on-site detention. Please verify, Vista Point II / MacArthur Ridge Response Applicant has a "will serve" letter from Jeff Curry Oncor. Halff to confirm with TxDOT, Halff/GF&F reviewing feasibility of this request. Current layout based upon City requirements Will be better defined on Dec. 9th re-submittal. Will verify inlet location, and adjust drive as needed to not conflict with existing inlet. Paver bands will be provided. Halff has confirmed that on-site detention is not necessary, per submitted Drainage Area Map. PI)-199-1tC Fire Administration Parks and Recreation Greg Jones John Elias 8. A deceleration lane ~s required on MacArthur and may be required on S.H. 121. Verify with TxDOT. 9. Eliminate the public on-site fire hydrant from S.H. 121. Bring fire hydrant offthe private fire line. 1. All Fire Lane radii 30' inside radii 54' outside radius 2. Contact FD to verify Fire Hydrant spacing, FDC locations and fire line requirements. 3. Add'l Fire access needed. Contact FD 4. Ref, Tract 4 for add'l comments 5. Bldgs over 5000 s.f. require auto fire sprinkler systems. 1. Tree mitigation shown on plan is unacceptable. 2. Tree mitigation will be the following: Gross Retribution (trees removed) 1354"DBH Preservation Credit -283"DBH Landscape Credit -891"DBH Net Retribution 233"DBH x $100 According to Mr. Chris Behnke (TxDOT-121_.P.M.), _ ..TxDOT will defer to the City We request reconsideration of declaration lane on \ MacArthur due to limited staging distance and / impact on existing inlet and trees (#'s 8, 9, 12). Hydrant @ N.E. Corner of Bldg 2 will be connected to private fire line. Site plan complies with this requirement. Current layout based upon City requirements, Halff has discussed with Fire Department and will revised plan for Dec, 9th re-submittah Halff has discussed with Fire Department and is waiting on additional City comments. Agree Brian Adams w/SMR has discussed John Elias PI)-199-1tC Planning Department Marcie Diamond Contribution in the amount of $23,300 to the City of Coppell Reforestation and Natural Areas Fund will be required. 3. Might want to consider Up-Sizing trees from 3" to 4" to off set retribution fees. Overall Comment: This property is zoned HC which only permits limited (max. 20%) warehousing, and only by SUP. The site plan approved for this tract 2 years ago was for an 100% office. This Concept Plan indicates approximately 50% warehousing including overhead doors and a significant amount of loading areas, adjacent to residential. The city has been proactive over the past year rezoning properties along S.H. 121 from Light Industrial to Highway Commercial to encourage retail/office and commercial uses and prohibit tilt wall industrial/warehousing along our gateway areas and adjacent to developed residential areas. This product, with 50% warehouse, is more appropriate in the established light industrial areas in the west side of Coppell. That being said, the following are technical issues also need to be addressed: Site Plan I. The proposed loading areas are facing, and in close proximity, to the single family homes. The site plan needs to be revised to limit the loading areas to being internal to the site, so as not to impact the adjacent residential or be visible from S.H. 121 or MacArthur Blvd. We will change all new tree calipers to 4" to 3", which will satisfy the contribution requirement. The overall comments are noted and Applicant will revise the site plan to address these concerns. However, upon review of the HC zoning ordinance (Article 22, Sec. 12-22-0) applicant was unable to find any restriction on the percentage of warehouse. Documentation as to this restriction is requested. Additionally, it appears the warehouse percentage restriction might have been borrowed from the Commercial zoning ordinance. It seems as if the scale of this proposed development is not been considered. The largest building on this site plan is roughly 43,000 SF. These buildings are would dwarfed next to 1MM SF warehouse in the western parts of Coppell. These are not warehousing building; yes they will have a warehousing component. Additionally, it appears the City of Coppell does not a definition for "warehousing"; thus, applicant has been asked to prepare a definition as part of its PD. The loading area adjacent to the single family homes has been reduced - providing additional buffering to residential community. The design will include the shielding of light sources from the view of adjacent residences and installation of a screen !wall and landscaping to buffer noise and visual !impact. PD-199-HC 2. The dumpster area between building 1 and 3 needs to be relocated away from the residential, and not being visible from dedicated rights-of-way. 3. A minimum 6-foot, solid, masonry, screening wall needs to be provided along the southern properly line adjacent to the residential district. It is also recommended that the required wall be extended along Forest Hill Drive to provide a visual buffer to the residential to the south. Elevations of this wall, including color, materials and height need to be provided. Also, need to include the timing of the construction of this wall in relation to the phased development. It is recommended that the entire wall be constructed with the first phase of development. 4. Parking spaces are required to be a minimum of 9'x 19'. 5. Need to indicate Phase lines and Tract lines between Tracts 1 and 2. 6. There are several random easement notes with either no arrows, or arrows which point to the wrong details. 7. Need to more clearly indicate the existing and proposed easements in relation to the property lines. 8. Must determine how these easements along the perimeter of the property will effect the proposed landscaping. Dumpster location has been revised and is now approximately 140 ft. from the residential area, A 6 -foot screen wall has been provided along the southern property line adjacent to the residential area. The section of screen wall will be constructed with the first phase of construction of the Jackson- Shaw tract. Screen wall along Forest Hill is not required per code because adjacent zoning is also HC. Also, the distance and grades from the adjacent homes in the Peninsulas will buffer the uses and a wall would be ineffective when considered along with the grades and distance from the homes. However, applicant has eliminated a drive along Forest Hill (comment #13) to provide additional buffering. Agreed Will be better defined on Dec. 9th re-submittal. Will be better defined on Dec. 9th re-submittal. Will be better defined on Dec. 9th re-submittal. Will be better defined on Dec. 9th re-submittal. PD- 199-HC 9. Monument signs must be setback 15 feet from property lines adjacent to the street, and 75 feet from common property lines. 10. Need to provide information about site, parking lot and building lighting, especially adjacent to the residential. 11. Provide dumpster locations on retail tracts. 12. Understanding that this is a Concept Plan additional note needs to be added to the plan which indicates that prior to any development on this tract, Detail Site Plan approval will be required for each building and that all restaurants and some types of retail will require approval of an SUP. 13. It is recommended that a maximum of two driveways be permitted along Forest Hill Drive. Conceptual Landscape Plan: 1. Must determine how existing and proposed utility easements along the perimeter of the property will effect the propose landscaping. 2. Need to indicate the required screening wall along the southern property line. 3. Due to the residential adjacency, trees are required at a ratio of one tree per 40 feet along the southern property line. It is recommended that a mixture of evergreen and overstory trees be planted along this property line. 4. Building landscaping should be provided in front Building 1, sim. ilar to Buildings 2 and 5. Agreed All site lighting will be designed to ensure minimal impact on adjacent residential community Will be better defined on Dec. 9th re-submittal. Will be better defined on Dec. 9th re-submittal. Agreed, please see note # 3. Will be better defined on Dec. 9TM re-submittal. Will be better defined on Dec. 9th re-submittal. See note #3 above. According to SMR, current plan fulfills requirement for 1 tree per 40 feet. Will address mixture of evergreen and overstory trees. All additional landscape buffering has been provided along residential buffer, per discussion with Marcie Diamond. Existing plans meets landscape/open space requirements, PD- 199-HC 5. If specific variances to the Landscape Ordinance are being requested (i.e. elimination of the 10 feet of landscaping along common property lines for the retail pads) then it must be specifically stated as such, Tree Survey: 1, It appears that increasing the landscape setback along MacArthur Blvd. By approximately 20 feet could preserve a significant amount of 10- 12 inch caliper Cedar Elms and Live Oak trees. Elevations: 1. Need to provide the percentage of stone/brick/wall per facade of each building. 1. Need to specifically state the color, materials, manufacture's specs, etc. for all materials indicated on the elevations, including the color of the overhead doors, awnings, etc. 2. Need to provide detail elevations, including color, height, materials, of the required screening walls. 3. Need to provide general signage criteria for all tracts within this PD, including attached and monument signs, size, color, font, light source, etc. 4. Need to provide color board at the December 4th DRC meeting. 5. Color renderings of the project would also be helpful. Will be better defined on Dec. 9TM re-submittal. Applicant to explore re-designs to address this comment. Will be better defined on Dec. 9th re-submittal. Agreed. Will be better defined on Dec. 9TM re-submittal. Will be better defined on Dec. 9th re-submittal. Provided for Dec. 4th Meeting Provided for Dec. 4th Meeting PD-199-HC