Loading...
ST9502-CN 960917 CITY OF COPPELL CHANGE ~}R EXTRA WORK ORDER PROJECT: Town Center Drive & Town Cenw, r BlvcL / ST 95-02 CONTRACTOR: Site Concrete, Inc OWNER: City of Coppell CHANGE ORDER NO.: "..1 Item DATE: Scptemb~a'17,1996 CHANGE OR EXTRA WORK TO BE DONE Description Quantity Unit Unit Price Total 1. 4'diameter manhole 1 ea 1~250.00 1,250.00 2. 8" D.I. Sanitary Sewer Pipe 10 if 46.50 465.00 3. 10" Sanitary Sewer Pipe 250 if 20.25 5,062.50 Total Change Order $6,777.50 The contractor hereby ~pm this Contrac~ adjustment as a ~ d complete adjustment in full accord and satisfaction of all past and future liability origin ' - under any clause in the Contract by reason of this r~vision to the Contract ' Recommended by the City Engineer: Date: d w the Contractor: Date: 17:11 CI 3F COPPELL ENGINEERING -, 95138661 CITY OF COPPELL CHANGE OR EXTRA WORE ORDER PROJECT: Town Center Drive & Town Center Blvd. / ST 95-02 CONTRACTOR: Sire Concrete, Inc OWNER: City of Coppell CHANGE ORIS~R NO.: 3 DATE: Septeanberl7, 1996 ADD: Item CHANGE OR EXTRA WORK TO BE DONE Description Quantity Unit Unit Price Total 3,306.00 3,306.00 1 Relocate 8" Water / Tie-In 1 LS 2,000.00 $2,000.00 2 Median Brick Pavers 492 SF 4.75 2,337.00 3 6' Stubout 24" C1 IV RCP I EA 510.00 510.00 4 Concrete Pavement/6"curb 153.28 SY 19.35 2,965.97 5 Lime Stabilization 153.28 SY 1 A5 222.26 6 Hydrated Lime 2.3 TN 100.00 230.00 7 Restock &arise. cost 1 LS 3,165.00 3,165.00 8 Provide labor 8c equip. Connect 48" pipe in lake 1 LS Total Revision to Contract Amount $14,736.23 The contractor hereby accepts this Contract adjustment as a final and complete adju.~anent in full accord and satisfaction of all past and future liability originating under any clause in the Contract by reason of this revision to the Contract. Date: