ST9604-CS 880224 NATHAN D. MAIER
CONSULTING ENGINEERS, INC.
February 24, 1988
Mr. Bill Brasher
St. Louis & Southwestern Railroad
Southern Pacific
7600 S. Central Expressway
Dallas, Texas 75216
Re: Fairway Drive
NDM Job NO.: 87-12-151.D
Dear Mr. Brasher:
Attached is a copy of a letter dated October 15, 1986, requesting
a grade crossing for "Fairway Drive" on behalf of the City of Coppell.
This request should still be in the processing stages of your approval
procedure.
Since this request was made, various circumstances have resulted
in a realignment of said "Fairway Drive". The new location is parallel
to and approximately 265.00 feet east of the original crossing. This
location should have no adverse affects upon the Traffic Impact Analysis
data as previously submitted. We have included an updated final plat,
paving plan, and crossing detail sheet. We request that these sheets
be substituted for those in the original request, to avoid delaying
the approval process.
Sincerely,
NATHAN D. MAIER
CONSULTING ENGINEERS, INC.
4BM/ld
Attachment
Three NorthP&rk/8800 N. Central Expwy./Sulte 300/Dallas, Texas 75231/(~14) '139-4741