Loading...
ST9604-CS 880224 NATHAN D. MAIER CONSULTING ENGINEERS, INC. February 24, 1988 Mr. Bill Brasher St. Louis & Southwestern Railroad Southern Pacific 7600 S. Central Expressway Dallas, Texas 75216 Re: Fairway Drive NDM Job NO.: 87-12-151.D Dear Mr. Brasher: Attached is a copy of a letter dated October 15, 1986, requesting a grade crossing for "Fairway Drive" on behalf of the City of Coppell. This request should still be in the processing stages of your approval procedure. Since this request was made, various circumstances have resulted in a realignment of said "Fairway Drive". The new location is parallel to and approximately 265.00 feet east of the original crossing. This location should have no adverse affects upon the Traffic Impact Analysis data as previously submitted. We have included an updated final plat, paving plan, and crossing detail sheet. We request that these sheets be substituted for those in the original request, to avoid delaying the approval process. Sincerely, NATHAN D. MAIER CONSULTING ENGINEERS, INC. 4BM/ld Attachment Three NorthP&rk/8800 N. Central Expwy./Sulte 300/Dallas, Texas 75231/(~14) '139-4741