Loading...
ST9502-CS 951107DAN BEAIRD INC. TEL, No.214-522-2682 Nov_, 7,95 10:~9 No.O05 P.Ol DAN ,L, TF, t, EPHONE 214 '52 2-3200 FAX 254.522'Z68Z November 7, 1995 To: Harry Hargrave FAX 233-5881 Harold Ginsberg FAX 871-2023 Steve Lipscomb FAX 248-6701 Ken Griffin FAX 304-3570 Bill Anderson FAX 931-9538 From: Dan Beuird Re: East/West Road Gentlemen: Ken Griffin was kind enough to get back to me yesterday and explain the situation on the east/west road. He stated that Tim West picked up the plans and was working on the new revised bids. I talked with Tim West this morning and he has gotten the figures back due to the fact that he got the contractor to bid on the proposed changes we had diSCussed at our meeting in Coppell, which many of you artended. AS you know, the original bid was for $179,800.00. The new bid (see attached breakdown) is for a total of $160,180.00. Of that amount, $19,460 is for the water line, which will be paid for entirely by the city. DRN BERIRD INC. TEL No.2~4-522-2682 Nov ?,95 ~0:~9 No.O05 P.02 November 7~ 1995 Page Two ObviouslV, Tim is anxious to get underway and is planning to start the spxne road tomorrow. He would like to Know if the east/west road is going to be included, so we need to get our heads together and either approve or disapprove this bid. we know that £or a~tual approval it has to be submitted to the City CounCil, which requires a 72 hour allowance for a special meeting. Mowever, it'would appear to me that if Ken Griffin, Harry and others feel this is a good bid, it would certainly be recommended to the council and they would take the appropriate action. In the meantime, Tim could get underway with the contracting. Ken, please look this memo over and be sure that I am correct. I may have misunderstood some points so please let me know if they need clarification. It appears that we need to communicate between the various parties involved and come to a decision as rapidly as possible. Please give me a call. with best regards, Dan Beaird DLB:rc Enclosure DAN BEAIRD INC, TEL No.21~-522-2682 Nov GO6T BREAKDOWN TOWN CENTER DRIVE 7,95 10:49 No. 005 P. 03 QUANTI.TY... DESCRIPTION ' A. PAVING t GRADING 1 Excavate to oneIts wtste 1500 cy 2 LIme Stabilization 3 c,~% 3250 sy 3 Hydrated Line (27#/~y) 44 Ion 4 6" 650 flex street pavl.ng 2831 sy 5 6" Integral curbing 1500 If 6 Street header 50 If 7 Saw cut existing pavement 125 if - 8 Remove existing curb &gutter 125 If 9 Drill &Grout to existing pavement 83 ea 10 6" concrete base for paveIs 348 sy 11 Furnish/install brick pavers 3132 $f 12 End barrlMde 50 If 13 4" PVC oonduit (no wire, estimated quantity) 700 If 14 Remove existlnq hydrant Iea · ' 'SUBTOTAL PANG & GRADiN~ · VI $,.3,o8 .oo BID AMOUNT $6,000.00 $13,975.00 $3,960.00 $63,131.00 $1,500.00 $150.00 $250.00 $750.00 $166.00 $8,700.00 $10,e4e.00 $1,250.00 $2,100.00 15500.00 / B. DRAINAGE WORK I CL-III RCP Ill 36" SUBTOTAL DRAINAGEWORK C. WATER LINE WORK 18" PVC water main 2 6" PVC hydrant lead 3 Fire hydrant 4 16" x 8" tapping aleeve 5 Valves - 8" 6 Valves - 6" 7 Fittings & blocking 8 Test & chlodnate IIUijTOTAL WAi"ER LINE WORK D. STAKING/ENGINEERING/BONDS 'SUBTOTAL ,~TAKINGtBNG'INEERINGIBON BID CLARIFICATIONS TOWN CENTER DRIVE 130 tf $8,060,d0 No median bdck payere, Water main to be on the South side of Town Center, Water line W-1 running North/South is not included. An ailownace of 700 If of 4" PVC sleeves. All work assumed to be dedicated to the City, Sales tax is only included on un-lncorporated materails. - ._/ "\\ $8,060.00 400 If 5 If Iea Iea 6 ea Iea I is $9,200.00 $110.00 $900.00 $4,000.00 $3,600.00 $560.00 $600.00 $500.00 ~.7,,809.00 ~..~ ,,~UBTOTAL """' ~ $148,410.00 ...,, . 12--0 I "'7~;t,,t::~ DAN BEAIRD INC. TEL No.21~-522-2682 Nov 7,95 lO:Z19 No.O05 P.Oz:I BID CLARIFICATIONS The followinl~ items are 1. Irrigation repairs or re-work. 2. Relocation of any existing util|tWs. 3. Landscaping, ~ree replacement, hydromul~hing or seedinS, 4. No lime stabilization at the roadway along the Wendy's south property line. 6" thick 3000 psi paving is included, 5. All work except the south roadway assumed to be dedicated to the City. No sales tax is included except on the south property line roadway, 6. Any City impact fees, tap fees, street fees. 7. Any rock excavation. 8. Any erosion control. 10. As discussed these spoils are to be wasted on adjacent Imported topsoil, existing materials to be used for backfill. C~W~9i20~grcakdown