Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
ST9604-CS 981218
Ken Griffin, P.E. Director of Engineering & ' Public Works 121181q "Gig 'em Aggies" / Ci~ of Coppell P.O. Box 478 ~oppell, T~as 75019 072)304-3679/(Metro 471-225D City of Coppell Project No: ST 9~-04; IContractor: Rebcon, Inc. 1868 W. Northwest Hwy Dallas, TX 75220 DESCRIPTION ROW ET EXCAV PVMT ~7DAY PVMT ;URB :ET HEADER RAILROAD HEADER i000 PSI CONC SIDEWALK CE ON CONC ) F i ON CONC ~IONO MEDIAN IROMULCH I SOD BUFFALO GRASS LANE STRIPE WHITE LANE STRIPE YELLOW l" WIDE STOP LINE WHITE · WIDE STOP LINE WHITE [ ARROW & ONLY STRAIGHT & ARROW ADV MARKER R-X-R TERM ANCH : RR CROSSING TRACK WORK ION CONTROL PVC SCH 40 TRENCHED "PVC SCH 40 TRENCHED "PVC SCH 40 TRENCHED "PV£ 40 BORED : SCH 40 TRENCHED ;ONDTR #8 XHHW COPPER 12 CONDTR #18 AWG CABLE 16 CONDTR #12 AWG CTOR LOOP LEAD IN NAL CABLE 5 CONDTR #16 AWG NAL CABLE 7 CONOTR #16 AWG ;ONOTR #6 POWER CABLE 3 CONDTR #20 AWG OPTICE IETECTOR NNECT 2 CONDTR #14 AWG )DP OET INSTALLATION ITAL LOOP DET VEHICLE DEr 2 CHAN ~20A MULT3SONIC 8 PHASE NEMA CONCTR(X.LER Wi CAelNET FOUNDATION TY 30-B WI CASING FOUNDATION TY 36-A WI CASING ONTROLLER FOUNDATION SIGNAL POLE W/30' MAST ARM 51 ~IGNAL POLE W/36' MAST ARM ~ 52 SIGNAL POLE W/44' MA_ST_ARM ~S~GNAL HEAD _ ~ S~ SE--~-(~ HEAD BACKPLA_TE_ s -- EAD BACKPL TE P.O.# 98-0003203-001 Pay Estimate No.: Project Name: Estimate Pedod: QUANTITY 4 Fairway Odve City of Coppell 11/01/98 - 11130198 QTY UNIT TO DATE PRICE $32,000.00 140.0 $19.00 2750.0 2213 $10.00 210.0 $10.00 520.0 548.4 $69.00 273.0 $2.00 37.0 $9.00 74,0 $15.00 725.0 $7.00 11.0 $98.00 $4.00 620.0 $9.00 $20.00 $90.00 $25.00 $3.00 $5.00 72.C ~ $2.00 104.0 154 $3.40 115.0 127 $7,00 36.0 $8.00 $500.00 $400.00 $500.00 $1,700.00 63.0 $300.00 $5,000.00 172.0 346 $2.50 3649.0 4065 $3,40 387.0 $5.30 204.0 262 $17.00 18.0 $10.00 465.0 471 $0.60 2809.0 3020 $1.50 526.0 673 $4.00 7725.0 8621 $0.60 468.0 $1.20 234.0 $1.70 209.0 $2.00 673,0 S~.30 $700.00 194.0 $1.10 1820.0 RI Job # 9811 TO DATE $0.00 $510.00 $0.00 $1,110., $4,669.' $3,819.2(3 $1,746 $400.9O $18,900, $o.oo $865.9O $916.90 $282.60 $621. 13.0 $84.00 45.0 $100.00 4.C $8,000. $600.00 I SIG ASSEMBLEY 2 INDICATION PUSH Bu'n'ON i METER INSTALLATION ~ PULL BOX ND PULL BOX INTERSECTION DISPLAY BOARD I W10-1 POLE & CONC FOUND TRAF SIGN W3-3 POLE & CONC FOUND ;IGN W10-2L POLE & CONC FOUND ;IGN W10-2R POLE & CONC FOUND IIGN R10-12 ;IGN RI0-4bR ]'RAF SIGN R10-4bL ;IGN R3-8LR IGNS ON MAST ARM MOUNTED BARRICADE DEVICE EXTRA WORK 15.0 $600.00 $4,8O0.00 $130.00 $2.000.00 $2,0O0.00 $5O0.00 $7,0O0.O0 S9~0.00 $9O0.O0 S4O0.00 $1,600.O0 $400.00 $0.00 $400.00 $400.O0 $4O0.00 $400.00 $100.00 $4O0.80 S20.00 $80.00 $20.00 $80.00 $2O0.00 S200.8Q $400.00 $1,600.O0 $20.00 $(3.00 $5,000.00 $5,000.00 S0.00 $0.00 Work Completed to Date: Less 10% Retainage: Less Previous Payments: Total Due This Estimate: $310,409.30 $279,368.37 Calendar Days for Final Completion: 180 R,.ecommended for Pay~ . enneth M. Griffin, P.E~.,'Oire#3f of Engineering Date: Date: J~' I ~'~ Public Works Ro~3ert C, Bibby / Calendar Days Used To Date: Remarks: 122