Loading...
ST9604-LR 980827Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Rebc0n, Inc, DATE: 27 August 1998 PROJECT: Fairway Drive, Coppell, TX JOB NO.: 98.1089 MATERIAL DESCRIPTION: 1) On-Site Fill - Brown Sandy Clay with Gravel 2) On-Site Fill - Brown & Grey Clay ASTM D 698 STANDARD PROCTOR: 1) 110.0 pcf @ 16.0% Moisture 2) 98,0 pcf ~ 21.0% Moisture LOCATION PROCTOR LIFT Fill Area North of RR Tracks MOISTURE DRY PERCENT REQUIRED CONTENT DENSITY COMPACTION COMPACTION % PCF % % 34) north side 1 8 16.1 35) south side 1 7 17.7 36) east side 2 7 21.9 105.2 95.6 95+ Optimum to +5% 110.0 100.0 101.5 103.6 TECHNICIAN: DISTRIBUTION: CDJ (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148