Loading...
ST9604-LR 980825Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Rebcon, Inc. DATE: 25 August 1998 PROJECT: Fairway Drive, Coppell, TX JOB NO.: 98.1089 MATERIAL DESCRIPTION: 1) On-Site Fill - Brown Sandy Clay with Gravel ASTM D 698 STANDARD PROCTOR: 1) 110.0 pcf ~ 16.0% Moisture LOCATION PROCTOR LIFT Fill Area North of RR Tracks MOISTURE DRY PERCENT REQUIRED CONTENT DENSITY COMPACTION COMPACTION % PCF % % 28) centerline 1 3 19.4 29) east side 1 2 19.0 30) west side 1 1 19.3 104.6 95.1 95+ Optimum to +8% 104.6 95.1 106.1 96.5 TECHNICIAN: DISTRIBUTION: CDJ (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148