ST9604-LR 980820Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF IN-PLACE DENSITY TESTS
CLIENT: Rebcon, Inc.
DATE: 20 August 1998
PROJECT: Fairway Drive, Coppell, TX
JOB NO.: 98.1089
MATERIAL DESCRIPTION: 1) On-Site Fill - Brown & Grey Clay
ASTM D 698 STANDARD PROCTOR: 1) 98.0 pcf ~ 21.0% Moisture
25)
26)
27)
LOCATION PROCTOR LIFT
BELOW
Fill Area North of RR Tracks SUBGRADE
centerline 1 1 '-2' 23.1
east side 1 1 '-2' 22.7
west side 1 I '-2' 21.2
MOISTURE DRY PERCENT REQUIRED
CONTENT DENSITY COMPACTION COMPACTION
% PCF % %
.93.6 95.5 95+
Optimum to + 5%
97.7 99.7
98,9 100.9
TECHNICIAN:
DISTRIBUTION:
CDJ
(1) Rebcon, Inc.
(1) City of Coppell, Garreth Campbell
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148