Loading...
ST9604-LR 980820Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Rebcon, Inc. DATE: 20 August 1998 PROJECT: Fairway Drive, Coppell, TX JOB NO.: 98.1089 MATERIAL DESCRIPTION: 1) On-Site Fill - Brown & Grey Clay ASTM D 698 STANDARD PROCTOR: 1) 98.0 pcf ~ 21.0% Moisture 25) 26) 27) LOCATION PROCTOR LIFT BELOW Fill Area North of RR Tracks SUBGRADE centerline 1 1 '-2' 23.1 east side 1 1 '-2' 22.7 west side 1 I '-2' 21.2 MOISTURE DRY PERCENT REQUIRED CONTENT DENSITY COMPACTION COMPACTION % PCF % % .93.6 95.5 95+ Optimum to + 5% 97.7 99.7 98,9 100.9 TECHNICIAN: DISTRIBUTION: CDJ (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148