Loading...
ST9604-LR 980817Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Rebcon, Inc. DATE: 17 August 1998 PROJECT: Fairway Drive, Coppell, TX JOB NO.: 98.1089 MATERIAL DESCRIPTION: 1) On-Site Fill - Brown & Grey Clay ASTM D 698 STANDARD PROCTOR: 1) 98.0 pcf ~ 21.0% Moisture 16) 1'7) 18) LOCATION PROCTOR LIFT BELOW Fill Area North of Belt Line Rd. SUBGRADE west side 1 5' 21.5 centerline 1 5' 22.8 east side 1 5' 22.5 MOISTURE DRY PERCENT REQUIRED CONTENT DENSITY COMPACTION COMPACTION % PCF % % 100.7 102.8 98 + Optimum to + 5% 100.6 102.7 98.0 100.0 TECHNICIAN: DISTRIBUTION: CDJ (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148