Loading...
CF-Coppell Rd SC-LR010926Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF WATER PRESSURE INJECTION CLIENT: PROJECT: SUPPLIER: LOCATION: PROCEDURE: Texas Unified Constructors, Inc. DATE: 26 September 2001 Field Service Offices & Maintenance Fac. for City of Coppell, TX Kenneth Moore JOB NO.: 01.1054 TIME: 7:30am-4:30pm 9.0 hours Building Pads (see below) NUMBER OF RIGS USED: 1 On 26 September 2001, a representative of Hooper Engineering Laboratories, Inc. visited the above named project during the time in which water pressure injection was taking place. During that time, he noted the following: SPECIFICATION REQUIREMENTS 1. Injection pressure 50 psi to 200 psi. 2. Injection downward in approx. 12" intervals until refusal (If No, see remarks below.) 3. Total depth of injection - 10 feet (If No, see remarks below.) 4. Spacing for injection approx. 5 feet maximum. (If No, see remarks below.) iNSPECTION RESULTS: 200, 200, 200 Yes Yes NOTES: Pass //3 completed on Secured Storage pad. Pass #1 completed at Vehicle & Equipment Storage pad. TECHNICIAN: DISTRIBUTION: CBC (3) City of Coppell (1) Vidaud & Associates (1) Texas Unified Constructors, Inc. (1) Doyle Engineering Group 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 i 00'