Loading...
CF-Coppell Rd SC-LR010922Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF WATER PRESSURE INJECTION CLIENT: Texas Unified Constructors, Inc, DATE: 22 September 2001 PROJECT: Field Service Offices & Maintenance Fac. JOB NO.: 01.1054 for City of Coppell, TX TIME: 6:00am-11:00am SUPPLIER: Kenneth Moore 5.0 hours OT LOCATION: PROCEDURE: Building Pad for Chemical Storage (Pass #1) NUMBER OF RIGS USED: 1 On 22 September 2001, a representative of Hooper Engineering Laboratories, Inc. visited the above named project during the time in which water pressure injection was suppose to take place, Scheduled operations for 6:30am. Rig kept breaking down. No injection today. SPECIFICATION REQUIREMENTS 1. Injection pressure 50 psi to 200 psi. 2. Injection downward in approx. 12" intervals until refusal (If No, see remarks below.) 3. Total depth of injection - 10 feet (If No, see remarks below.) 4. Spacing for injection approx. 5 feet maximum, (If No, see remarks below.) INSPECTION RESULTS: TECHNICIAN: DISTRIBUTION: CBC (3) City of Coppell (1) Vidaud & Associates (1) Texas Unified Constructors, Inc, (1) Doyle Engineering Group 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148