Loading...
Freeport NIP(2.2)-LR010822WATER INJECTION OBSERVATION ENGINEERING, INC. Date of Service: Client No.: Client; Location: Procedure: 08/22/01 3053 TNA North American, Inc. 1321 Valwood Parkway, Suite 440 Carrollton, TX 75006 Report No.: Project No.: Project: General Contractor: Injector: 94011204.0021 94011204 Sales Office &Warehouse Fac. Coppell, Texas Pacific Builders Kinley On this date, a representative of HBC Engineering, Inc. observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 6th No. of Probes: 4 Probe Length: ! 1.25 OBSERVATION SPECIFICATION Yes No N/A Surfactant added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of injection was 10 feet. X Spacing of injection was 5 feet maximum. X lniection to refusal at each location. X Comments: Technician: T. Smith Report Distribution: ( l ) TNA North American, [nc (1) Carroll Poole & Yost Architcclure (I) R L G(xx:ison Consuhing Engineers (I) Pacific Builders (1) FACScrvices, hie (I) David Kent (I)CityofCoppell Bldg lnsp ( 1 ) City of Coppell - Constr lnsp Eric J. Cleveland, P. E. Senior Project Engineer 99ss This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineer