Loading...
Freeport NIP(2.2)-LR010821WATER INJECTION OBSERVATION ENGINEERING, LNC. Date of Service: Client No.: Client: Location: Procedure: 08/21/01 3053 TNA North American, Inc. 1321 Valwood Parkway, Suite 440 Carrollton, TX 75006 Report No.: Project No.: Project: 94011204.0019 94011204 Sales Office &Wamhouse Fac. Coppell, Texas General Contractor: Injector: On this date, a representative of HBC Engineering, Inc. observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 5th No. of Probes: 4 Probe Length: 12 feet OBSERVATION SPECIFICATION Yes No N/A Surfactant added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of injection was 10 feet. X Spacing of injection was 5 feet maximum. X lniection to refusal at each location. X Comments: A single injection rig ran consistantly in rows north and south and finished the fifth pass and began the sixth pass. Technician: J. Halverson/T. Smith Report Distribution: (1) TNA NoHb American, Inc ( I ) Carrell Poole & Yosl Architecture ( 1 ) R L Goodson Consulting Engineers (I) Pacific Builders, Inc ( I ) FACScrviccs, Inc (I) David Kent (1) City of Coppell - Bldg lnsp (I) City of Coppcll Constr. Insp. ~, Inc. Eric J. Clev land, P. E. Senior Project Engineer 99ss This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineer