Loading...
Freeport NIP(2.2)-LR010820WATER INJECTION OBSERVATION ENGINEERING, [NC. Date of Service: Client No.: Client: Location: Procedure: 08/20/01 3053 TNA North American, Inc. 1321 Valwood Parkway, Suite 440 Carrollton, TX 75006 Report No.: Project No.: Project: 94011204.0018 94011204 Sales Office &Wamhouse Fac. Coppell, Texas General Contractor: Injector: On this date, a representative of HBC Engineering, Inc. observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 4th No. of Probes: 4 Probe Length: 12 feet OBSERVATION SPECIFICATION Yes No N/A Surfactant added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of injection was 10 feet. X Spacing of injection was 5 feet ]naximum. X Iniection to refusal at each location. X Comments: One injection rig ran consistent, finishing the fourth pass and beginning the fifth pass, rows ran north and south. Technician: J. Halvcrson/T. Smith Report Distribution: (1) TNA North American, lnc (1) Can'ell Pool¢ & Yos[ Archdectule (I) R L Gc×~dson Consulting Engineers (1) Pacific Builders, Inc ( I ) FACServices, Inc (I) David Kcnt (1) City of ( oppcll - Bldg [nsp (I) City of Coppcll Constr lnsp ~ Engineering, Inc. Senior Project Engineer 99ss This repod is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineer