Loading...
WA0001-CS000303 (2)SHIMEK, JACOBS & FINKLEA, L.L.P. CONSULTING ENGINEERS 8333 Douglas Avenue, #820 RONALD V. CONWAY, P.E. JOHN W. B1RKHOFF, P.E. JOE R. CARTER, P.E. GARY C. HENDRICKS. P.E. PAUL A. CARLINE, P.E. MATT HICKEY, P.E. ROSS L. JACOBS. P.E. Dallas, Texas 75225-5816 Fax (214) 361-0204 March 3, 2000 Phone (214) 361-7900 Transmitted via Facsimile ~ sI Advantage COlatract Serv'ce , nc. 7150 AImed/Genoa Rd. Re: City of Coppell Repainting of the 1.5 Million Gallon Elevated Storage Tank Dear Ms. Vaughn; On behalf of the City of Coppell, Advantage Contract Service, Inc. is hereby directed to proceed with the work required to repaint the interior bowl of the 1.5 Million Gallon Elevated Storage Tank. The scope of work is outlined in your contract with the City dated February 8, 2000. The contract documents provided for a notice to proceed to be issued on February 25, 2000 with the completion of the interior tank repaint no later than April 25, 2000. Due to other projects critical to the safe operation of the water system, this project has been delayed seven (7) calendar days. Therefore, your new completion date for having the interior bowl of the tank repainted and back in service is Tuesday, May 2, 2000. If you have any questions or need additional direction, please do not hesitate to contact this office. incere , Mr. Kenneth M. Griffin, P.E. Mr. Glenn D. Hollowell, P.E. ~,,'Mr. Larry Davis Henley Johnston & Associates, Inc. CC: CITY OF COPPELL, TEXAS 1.5 Million Gallon Elevated Storage Tank Repaint PROJECT NO. WA00-01 PI~E-CONSTRUCTION CONFERENCE February 25, 2000 at 10:00 a.m. MEETING AGENDA 1. Introductions and Attendance Sheet 2. Contractor's Superintendents: 3. Coppell On Site Representative: 4. Coppell City Inspector: Name: Phone No. (Day) Name: Phone No. (Day) Name: Phone No. (Day) (Night) (Night) (Night) 5. Subcontractors 6. Insurance Certificates / 7. Construction Plans and Specifications: (5 Sets to the Contractor) 8. Contract Documents 9. Submittals List (SC.23) 10. Easements, Right-of-way, Permits 11. Construction Sequencing 12. Contractor's Construction Schedule · Coordination with Fire Department 13. Contractor's Projected Cash Flow 14. Monthly Pay Request: (10% Retainage) 15. Utility Companies TU Electric and Service for Dehumidification 16. Extra Work - Change Orders 17. Sanitary Provisions 18. Quality Control and Testing 19. Work Order and Contract Dates 20. Emergency Facilities 21. Additional Comments ROSS L. JACOBS, P.E. RONALD V. CONWAY, P.E. JOHN W. BIRKHOFF, P.E. JOE R. CARTER, P.E. GARY C. HENDRICKS. P.E. PAUL A. CARLiNE, P.E. MATT HICKEY. P.E. SHIMEK, JACOBS & FINKLEA, L.L.P. CONSULTING ENGINEERS 8333 Douglas Avenue, #820 Dallas, Texas 75225-5816 Fax (214) 361-0204 February 25, 2000 Phone(214)361-7900 Advantage Contract Services, Inc. 7150 Almeda Genoa Rd. Houston, Texas 77075 Re: City of Coppell Repainting of the 1.5 Million Gallon Elevated Storage Tank Gentlemen: We are handing you two fully executed copies of your contract with the City of Coppell, for the repainting of the interior of the 1.5 million gallon elevated storage tank. These sets are for your files. In addition we are handing you five sets of plans and specifications for your use during the construction phase of the project. Please be sure to have at least one set on the project site at all times. Finally, the contract documents state the completion date for this project is April 25,2000 assuming a February 25th Notice to proceed by the City of Coppell. Due to another ongoing water system project, the notice to proceed for this project must be postponed at least one week. As provided in the contract documents, the contract completion date will be adjusted accordingly. Therefore, a notice to proceed will not be issued today. We will keep you informed of the progress on the other water system project and provide you with the City 's anticipated schedule for starting this project as soon as it is known. If you have any questions or need additional information, please do not hesitate to contact this office. Gary C. H Enclosures cc: r. Kenneth M. Griffin, P.E. t, YMMr. Glenn Hollowell, P.E. Page 1 of 1 MONTHLY PAY REQUEST CITY OF COPPELL, TEXAS Repainting of the 1.5 Million Gallon Elevated Storage Tank Interior From: 3-Mar-00 To: 31-Mar-00 Pay Request No. Contract Date: Original Contract Amount: Revised Contract Amount: Contractor: Advantage Contract Services, Inc. 7150 Almeda Genoa Hous~n, Texas 77075 Item No. Quantity Unit Pro sill Description BASE BID 1 AbrasiveBlastlngtheintedorAreaofTank L.S. 1 2 Paint the Interior Area of the Tank L.S. I 3 Disposal of Interior Paint & Blasting Media Removed L.S. 1 4 Miscellaneous Remedial Welding by a Certified Welder Hr$. 10 5 24" Motor Operated Butterfly Valve L.S. 1 6 Electric Dehumidification System for Interior Blast, Paint & Cure L.S. 1 ADDITIVE ALTERNATE ] A Safety Climb Device on Existing Dry & Wet Ladders L.F. 131 Revised Quantity Project Start Date: Est. Completion Date: Allotted: Quantity Comple~ Total This Work Request Completed FebmaB' 8, 2000 $ 3-Mar-2000 2-May-2000 Used: Contract Price $45,000.00 $ $45,000.00 $ $5,000.00 $ $85.00 $ $7,500.00 $ $18,850.00 $ $26.72 $ 125,700.32 29 Extended Amount Prepared and Subnfitted by: SHIMEK, JACOBS & FINKLEA, L.L.P. Consulting Engineers, Dallas, Texas By: Date: Gary C. Hendricks, P.E. Approved for Owner By: Date: Total Amount Less Amount Retained Total Amount Payable Less Previous Payments Amount Due This Request 10% $ $ $ $ SHIMEK, JACOBS & FINKI.EA, L.L.P. CONSULTING ENGINEERS Client: City of Coppell, Texas Project: 1.5 Million Gallon Elevated Storage Tank Repaint Date: Time: Type of Meeting: February 25, 2000 10:00 a.m. Pre-Construction Conference 1. Gary C. Hendricks, P.E. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. ATTENDANCE SHEET Representing Phone Number Fax Number Shimek, Jacobs & Finklea, L.L.P. (214) 361-7900 (214) 361-0204 c? ~ s ) ~ /-o 7,~ 7 c~, ~ ~/-,~ ~