Freeport NIP(2.2)-LR010808WATER INJECTION OBSERVATION
ENGINEERING, 1NC.
Date of Service:
Client No.:
Client:
Location:
Procedure:
08/08/01
3053
TNA North American, Inc.
1321 Valwood Parkway, Suite 440
Carrollton, TX 75006
Report No.:
Project No.:
Project:
94011204.0012
94011204
Sales Office &Warehouse Fac.
Coppell, Texas
Building Pad
General Contractor:
Injector:
Pacific Builders
Kinley
On this date, a representative of HBC Engineering, Inc. observed the injection of water at this
site. During the injection process, the following observations were recorded.
Pass No.: 4th No. of Probes: 4 Probe Length: 12 feet
OBSERVATION
SPECIFICATION Yes No N/A
Surfactant added to each load. X
ln,jection pressure 50 to 200 psi at manifold. X
Injection downward in 18 inch intervals. X
Total depth of injection was 10 feet. X
Spacing of injection was 5 feet maximum. X
Iniection to refusal at each location. X
Comments:
Technician: D. Boyd/T. Smith
Report Distribution:
(1) THA North Amcrican, Lac.
(1) Carrell Poole & Yost Architecture
(1) R. L. Goodson Consulting Engineers
(1) Pacific Builders. Inc.
(I) FACServices, Lac
(1) David Kent
(1) City of Coppell ~ Bldg. Insp
( 1 ) City of Coppell - ConslY. Insp
ring, Inc
Eric J. Cleveland, P. E.
Senior Project Engineer
99ss This report is exclusively for the use of the client indicated above and shall not be reproduced in full without wdtten approval of HBC Engineer